Laserfiche WebLink
Ordinance No. 2245 <br /> Page 2 of 37 <br /> WHEREAS, on March 21, 2023, the City Council held a duly noticed public hearing on the <br /> Project and considered all public testimony, agenda reports, and related materials, and the <br /> recommendations of City staff and the Planning Commission; and <br /> WHEREAS, on March 21, 2023, an Addendum and MMRP was prepared pursuant to <br /> CEQA Guidelines Sections 15183 and 15162 for the Project and was adopted by the City Council; <br /> and <br /> WHEREAS, the City Council finds that the PUD development plan is consistent with the <br /> General Plan and the purposes of the PUD ordinance based on the considerations set forth in <br /> this ordinance. <br /> NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF PLEASANTON DOES <br /> HEREBY ORDAIN AS FOLLOWS: <br /> SECTION 1. With respect to the Case No. PUD-136, the City Council makes the <br /> following findings and determinations with respect to each of the considerations for a PUD <br /> Development Plan as required by Section 18.68.110 of the Pleasanton Municipal Code (PMC): <br /> 1. Whether the plan is in the best interests of the public health, safety, and general <br /> welfare: <br /> The Project, as conditioned, meets all applicable City standards concerning public health, <br /> safety, and welfare. The Project would include the installation of all required on-site utilities <br /> with connections to municipal systems to serve the new development. With the recommended <br /> traffic mitigations, the Project will not generate volumes of traffic that cannot be <br /> accommodated by existing City streets and intersections in the area. The structures would be <br /> designed to meet the requirements of the Uniform Building Code, Fire Code, and other <br /> applicable City codes. Adequate access would be provided to the structures for police, fire, <br /> and other emergency response vehicles. Stormwater run-off from the site will be treated <br /> before leaving the site. Construction hour limits and dust suppression requirements would <br /> minimize construction impacts on the surrounding residents and tenants. The Project is <br /> compatible with the adjacent uses and would be consistent with the existing scale and <br /> character of the area. <br /> 2. Whether the plan is consistent with the City's General Plan and any applicable specific <br /> plan: <br /> The Property's Land Use Designation of Mixed Use permits residential uses; thus, the Project <br /> would be consistent with the General Plan Land Use Designation. The proposed density of <br /> 40 dwelling units per approximate acre, plus 50 percent density bonus, is consistent with the <br /> General Plan. The Project would further several General Plan Programs and Policies including <br /> encouraging the reuse of vacant and underutilized parcels by development on an <br /> underutilized parking lot within the existing urban area; requiring higher residential and <br /> commercial densities in the proximity of transportation corridors and hubs such as the nearby <br /> West Dublin Pleasanton BART station; assuring that new major commercial, office, and <br /> institutional centers are adequately served by transit and by pedestrian and bicycle facilities; <br /> and encouraging new infill housing to be developed and for the City to attain a variety of <br /> housing sizes, types, densities, designs, and prices which meet the existing and projected <br /> needs of all economic segments of the community with the Project providing studios to three- <br /> bedroom units and more than 16 percent of the total units produced (24 percent of the base <br /> units, before density bonus) will be affordable to low-income households. The Project's <br />