My WebLink
|
Help
|
About
|
Sign Out
PC-2023-04
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2023
>
PC-2023-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2023 3:38:25 PM
Creation date
3/22/2023 3:26:56 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
1/11/2023
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Objective Desiga standards tor Housing §jtes <br />E. Project Review and Approval Procedures <br />All development applications for the identified housing sites will be reviewed by the City through the <br />following procedures, known as a Housing Site Compliance Review . This Compliance review shall <br />provide for the City 's review ofa proposed housing project located on each of the sites identified in <br />Figure I for compliance to applicable objective design standards and related environmental mitigation <br />measure. Note that 5th Cycle Carryover sites, shown in Figure 2 may be eligible for similar review, but <br />to do so , amendment of their existing PUO Ordinances to specify the revised procedure would be <br />required .: <br />I. Procedures for Review <br />The reviewing body shall be based on project size as follows: <br />• Projects including up to 50 residential units (exclusive of any AOUs or Junior AOUs) shall be <br />reviewed by the Zoning Administrator, who shall consider and render a decision regarding <br />whether the project complies with applicable objective design standards and related <br />environmental mitigation measures. <br />• Projects including 51 or more residential units (exclusive of any AO Us or Junior AOUs) shall be <br />reviewed by the Planning Commission, which shall consider and render a decision regarding <br />whether the project complies with applicable objective design standards and related <br />environmental mitigation measures <br />In the case of projects subject to Zoning Administrator review, if, within 7 days of mailing the below- <br />referenced notice, the zoning administrator receives a request for hearing, the zoning administrator shall <br />schedule an administrative hearing within the time frame established by law for decisions made on <br />project. The zoning administrator's decision shall be made either administratively if no hearing is <br />requested, or after the administrative hearing. <br />The Zoning Administrator or Planning Commission, as specified, shall approve the project if it complies <br />with: a) the requirements of the objective design standards and any other applicable objective standard <br />established with adopted City plans and documents; and b) mitigation measures of any applicable <br />environmental document(s). <br />If the project does not comply , conditions may be imposed to achieve compliance, or the project may be <br />denied. <br />2. Application Submittal Requirements <br />The City shall separately develop a list of data and other materials required to be submitted as part of an <br />application for Housing Site Compliance Review . Until such time as that list is developed, any <br />application shall , at a minimum include, the information and data enumerated in PMC Chapter <br />18 .68 .110.0.1 through 0.10., as well as information sufficient to clearly illustrate any proposed project <br />phasing. <br />3. Public Notification Required: Surrounding property owners within 1,000 feet of the project site shall <br />be mailed notice of the proposed Zoning Administrator action , or of the Planning Commission meeting, <br />as applicable. On-site project notification shall also be required, in conformance with the City 's adopted <br />policy. <br />4. Notice of Zoning Administrator or Planning Commission Action <br />Within five days of the date of the zoning administrator or planning commission 's decision approving, <br />conditionally approving, or denying a project, the secretary shall transmit written notice of the decision: <br />C ity of Pleasa nton -9 -DRAFT: January 4 , 2023
The URL can be used to link to this page
Your browser does not support the video tag.