Laserfiche WebLink
<br />13 <br /> <br />The foregoing is considered an initial distribution only, and through the subsequent <br />planning process, property owners may agree to and propose alternative distribution of <br />units for consideration by the City as part of its approval a future Framework plan or <br />other master planning document. It is further noted that, in addition to units allocated to <br />properties owned by Simon Property Group (and affiliated entities), units permitted by <br />existing zoning as of December 2022 that are not yet constructed may be allocated to <br />any of SPG’s other properties, including being combined with one or more of the <br />allocations made as part of the 6th Cycle Housing Element. <br />Recognizing the complexity of the Stoneridge site, and the numerous constraints and <br />other factors that will need to be considered in the overall Framework, as well as in <br />individual site plans, the City will allow flexibility in the location of housing projects within <br />specific parcels, or for an allocation to be placed on a larger or smaller area than 3 <br />acres, provided that the minimum and maximum densities specified in the Housing <br />Element are met. <br />Finally, the maximum densities have been established based on known and expected <br />conditions and constraints as the time of adoption of the 6th Cycle Housing Element. <br />The City may, with sufficient supporting information and analysis, elect in the future to <br />grant an increase the total housing allocation for Stoneridge, such an increase would <br />not, in the determination of the City Council, cause unacceptable traffic, environmental <br />or public services impacts, and that doing so would be in the best interest of the <br />redevelopment of the mall and the interests of the Pleasanton community. <br /> <br /> <br />D. Design and Placemaking Elements to be Reflected in a Future Framework Plan <br />The following Elements should be reflected in any future Framework plan or other <br />master plan for Stoneridge Mall: <br />1. The Framework Circulation Plan shall provide for an interconnected <br />network of pedestrian, bike and vehicle circulation including the following <br />features. A conceptual circulation plan is shown in Appendix A, Figure 2 : <br />• An Internal Street/Drive which provides slow-moving vehicle and safe pedestrian <br />circulation around the perimeter of the Mall building(s). Some segments may be <br />pedestrian only due to grades. <br />• A multi-use path (minimum 12 feet wide) around the entire perimeter of the Mall <br />along Stoneridge Mall Road, which shall accommodate pedestrians and cyclists <br />on a facility separated from vehicle travel lanes. (See diagrams below) <br />• The street network currently connecting to the Mall should be extended to <br />provide an organized series of intersections and streets or drives into the interior <br />of the site(s), generally at locations shown on the conceptual Circulation Plan. <br />New streets or drives should be aligned with existing roads and intersections <br />whenever possible, and pedestrian crossings provided at all intersections.