My WebLink
|
Help
|
About
|
Sign Out
PC-2023-06
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2023
>
PC-2023-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2023 3:39:19 PM
Creation date
3/22/2023 3:25:55 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/22/2023
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />obtain a Transportation Permit. For information about Transportation Permits call 925-931-5677. <br />(Address this condition prior to permit issuance) <br /> <br />78. TEMPORARY TRAFFIC CONTROL: Work in the public right-of-way or publicly-accessible <br />easement areas require submittal, review, approval, and implementation of a temporary traffic <br />control plan. The plan shall be in writing and subject to review and approval of the City’s Traffic <br />Engineer. The plan must conform to the California Manual on Uniform Traffic Control Devices (CA <br />MUTCD), with specific emphasis on Part 6 “Temporary Traffic Control”. <br /> <br />If Flaggers will be utilized, said personnel must be trained in the proper fundamentals of flagging <br />moving traffic before entering the right-of-way. The City may demand to see evidence of said <br />training before allowing said personnel into the right-of-way. <br /> <br />Prior to work within a traffic signal-controlled intersection, the applicant shall request the City <br />place the signal on all-directions flashing red. Temporary STOP (R1-1) signs shall be placed at <br />each approach leg. <br /> <br />Any alterations to pedestrian paths of travel must conform to current standards for the disabled. <br />Any walking member of the public with a visual impairment (cane or guide dog) must be escorted <br />through the construction zone. (Address this condition during construction) <br /> <br />79. HIGH VISIBILITY SAFETY APPAREL: All workers on foot who are exposed to the hazard of <br />vehicular traffic shall wear warning garments such as vests, jackets, or shirts manufactured in <br />accordance with the requirements of the American National Standards Institute <br />(ANSI)/International Safety Equipment Association (ISEA) 107-2004 Performance Class 2, high <br />visibility safety apparel and headwear, or any updates adopted by Cal OSHA. During hours of <br />darkness, warning garments shall be retroreflective with visibility from a minimum 1,000 feet. <br />(Address this condition during construction) <br /> <br />80. EXCAVATION SAFETY: All excavations must be performed in conformance with California <br />Government Code Section 4216 et seq. No excavation shall occur until proper notice is provided <br />to Underground Service Alert (usanorth811.org) by calling either 811 or 800-642-2444 at least <br />72-hours prior to the work so buried utilities can be marked. All excavations shall be covered or <br />barricaded to prevent entry when work is inactive. Open excavations in the public right-of-way <br />must be covered by skid-resistant steel plates that are firmly affixed to the surface with leading <br />edges ramped. Excavations approximate five feet and deeper require a protective system as <br />defined by Cal-OSHA. If a shoring system or trench boxes will be utilized as the protective <br />system, said system shall either be manufactured and installed according to manufacturer <br />recommendations, or designed by a registered professional engineer and installed according to <br />approved plans. No excavation shall be performed atop or adjacent to a high-risk facility until <br />authorized by the owner of the facility. High-risk facilities are defined as gas transmission <br />pipelines and hazardous liquid pipelines as regulated by the U.S. Department of Transportation <br />Pipeline and Hazardous Materials Safety Administration (US DOT PHMSA) (Address this <br />condition during construction) <br /> <br />81. POLLUTANT REDUCTION IN STORMWATER: At no time during construction of the project <br />shall pollutants be allowed to enter, clog, or contaminate storm drain pipe networks or open <br />stormwater channels in violation of Pleasanton Municipal Code §9.14.080 et seq. The applicant <br />shall contain all trash and debris for proper disposal to authorized landfills or recyclers. Erosion <br />control features shall be deployed during the rainy season that extends from October 1 to April 15 <br />each year, or any time rain is forecast outside of this period. Best Management Practices (BMPs) <br />shall be strictly followed. Street sweepers must be employed if soil or debris is tracked onto the
The URL can be used to link to this page
Your browser does not support the video tag.