Laserfiche WebLink
Ordinance No. <br /> Page 22 <br /> 63. CLEAN WATER PROGRAM (LARGE PROJECTS): Because the project creates and/or <br /> replaces more than approximately 10,000 square feet (approximately 0.23 acres) of <br /> impervious surface, it is considered a Regulated Project according to Provision C.3.b of <br /> the Municipal Regional Stormwater NPDES Permit that regulates stormwater runoff in <br /> Alameda County. The Alameda Countywide Clean Water Program developed a C.3 <br /> Guidance Manual to assist applicants in addressing these regulations. The Guidance <br /> Manual is available for download at: <br /> hftps://www.cleanwaterprogram.org/businesses/development.htmI <br /> Regulated projects must include stormwater treatment measures in the site design to <br /> remove pollutants from stormwater upstream of any connection to the City's or Alameda <br /> County's stormwater conveyance networks. In addition, regulated projects must be <br /> subject to a Stormwater Treatment Measure Maintenance Agreement between the City <br /> and property owner to assure long-term maintenance of the installed measures. The City <br /> will provide a template agreement. Once executed, the agreement must be recorded <br /> against the property. (Address this condition prior to plan approval) <br /> 64. GEOTECHNICAL RECOMMENDATIONS: Recommendations from the project's <br /> geotechnical investigation, as prepared by a California-licensed Geotechnical Engineer <br /> or Certified Engineering Geologist, shall be incorporated into the design of the <br /> improvements and/or explicitly noted on the plans. The author(s) of the geotechnical <br /> investigation shall certify on the plans that the design complies with their <br /> recommendations. During construction, the applicant must follow all recommendations. <br /> (Address this condition prior to plan approval) <br /> 65. SUBDIVISION MAPS: The subdivision of land is governed by Pleasanton Municipal <br /> Code Title 19, as well as the California Government Code §§66410-66499.85 <br /> (Subdivision Map Act). All maps are subject to review and approval by the City Engineer. <br /> Recordation of the subdivision map shall be coordinated by the applicant's title <br /> company, with one full-sized mylar copy of the recorded map returned to the City. <br /> The following statement shall be included on the cover sheet of the map: "l, Stephen M. <br /> Kirkpatrick, P.E., City Engineer of the City of Pleasanton, County of Alameda, State of <br /> California, do hereby state that I have examined the herein embodied map entitled <br /> "[MAP NAME/NUMBER]" consisting of[NUMBER OF SHEETS] sheets, this statement <br /> being on Sheet 1 thereof and that the [PARCEL OR TRACT] map was presented to me <br /> as provided by local ordinance. This map conforms with the requirements of the <br /> Subdivision Map Act and of any local ordinances applicable at the time of approval of the <br /> tentative map, and the subdivision as shown is substantially the same as it appeared on <br /> the tentative map, if any, and any approved alterations thereof. The name of the <br /> subdivider is as shown on the statement of owner upon this sheet." <br /> For parcel maps, add the following: "The dedications and/or easements shown as [LIST] <br /> upon said map thereon offered for dedication are hereby accepted for the purpose for <br /> which offered." <br /> "Stephen M. Kirkpatrick, P.E., Registration No. 53367, City Engineer, City of Pleasanton, <br /> County of Alameda, State of California [SIGNATURE LINE], [DATE], [SPACE FOR <br /> STAMP]" (Address this condition prior to map approval) <br />