Laserfiche WebLink
Attachment 2 <br />General Fund Budget Request <br />Staff Prioritized Listing <br />Staff Priority <br />Existing <br />Ranking <br />Project Type <br />CIP # <br />Description <br />Fund <br />Balance <br />FY2024 <br />FY2025 <br />FY2026 FY2027 <br />Future Year Notes <br />201 <br />2,500,000 <br />430,408 <br />. <br />1 <br />Transportation <br />11514 <br />W Las Positas/Tassajara Repair <br />202 <br />921,775 <br />2,300,000 <br />FY 2024 allocation fully funds the $10 million estimate presented to City Council at FY 2022/23 mid - <br />211 1 <br />291,793 <br />- <br />_ <br />term budget review. Project is under design <br />2 <br />Parks <br />22795 <br />Pleasanton Cricket Pitch & Field <br />201 <br />250,000 <br />50,000 <br />- - <br />FY 2024 allocation fully funds the project total estimtaed cost of $550,000. Construction anticiapted <br />221 <br />249,269 <br />- <br />- <br />Fall 2023 <br />3 <br />Parks <br />20774 <br />Design Skate Park <br />201 <br />3,000,000 <br />2,718,381 <br />FY 2024 allocation fullyfunds the $6 millionfunding level for the project establishd by City Council at <br />the FY 2022123 mid-term review. Project is under design <br />4 <br />Miscellaneous <br />23493 <br />Library Lighting <br />201 <br />332,000 <br />900,000 <br />FY 2024 allocation fully funds project based upon cost estimate of 65% design <br />5 <br />Miscellaneous <br />New <br />Asset Management Plan <br />201 <br />750,000 <br />250,000 <br />250,000 250,000 <br />Asset Management Plan for Repair and Replacement and Capital Improvement Projects (State of <br />Good Repair eromects only) Required to plan and fund maintenance needs of existing assets <br />6 <br />Miscellaneous <br />New <br />CAP Projects (EV Fleet Charging) <br />201 <br />- <br />1,000,000 <br />500,000 500,000 <br />F' 2024 allocation for installation of electrical upgrades for EV fleet charging at 200 Old Bernal and <br />OS D. Future funding for antici pated expansion <br />7 <br />Parks <br />23744 <br />Annual Court Resurfacing <br />221 <br />250,000 <br />200,000 <br />400,000 <br />Tennis and basketball court resurfacing (Fairlands, Del Prado, Hansen) <br />8 <br />Parks <br />New <br />Annual Park Sidewalk/Trail/Pathway Resurfacing <br />201 <br />350,000 <br />200,000 <br />150,000 150,000 <br />Replacement of paved pathways (Suttergate, Marilyn Murphy Kane) <br />9 <br />Miscellaneous <br />23415 <br />Annual Storm Repair And Replac <br />441 <br />125,000 <br />125,000 <br />125,000 <br />125,000 125,000 <br />Funding to improve storm drain system and make repairs from winter storm events. <br />10 <br />Parks <br />22745 <br />Annual Playground Renovations <br />221 <br />14,212 <br />300,000 <br />550,000 <br />Playground renovations at Val Vista (Phase 2), Amador Valley Park, Ken Mercer <br />11 <br />Miscellaneous <br />New <br />Sycamore Creek Storm Drain Realignment <br />441 <br />200,000 <br />550,000 <br />- <br />Design and Construction to re -align a 60" storm drain line to help alleviate flooding risk at Sycamore <br />Creek and Sunol Blvd. <br />12 <br />Miscellaneous <br />23494 <br />123 Main Street Roof and HVAC Replacement <br />201 <br />249,000 <br />4,500,000 <br />The HVAC system is no longer commercially available and requires custom replacement parts.The <br />HVAC will re q uire a re-desi n of the system, breaki ng the HVAC system into smaller units. <br />13 <br />Miscellaneous <br />New <br />Police CAD/RMS <br />201 <br />1,400,000 <br />Replacement of Computer Aided Dispatch (CAD) and Records Management System (RMS) to be <br />14 <br />Miscellaneous <br />23479 <br />Design Of Police Dept. Secured Police & Staff <br />com liant with new reporting standards. <br />Vehicular Parking <br />201 <br />100,000 <br />200,000 <br />Project will increase the police department parking by expanding the existing fence into adjacent <br />parking lots and include minor paving to Provide additional fleet and staff parking, <br />15 <br />Parks <br />New <br />Irrigation Controller Replacement Phase 1 Parks <br />201 <br />150,000 <br />150,000 <br />150,000 150,000 <br />Replacement of irrigation equipment past useful life and update to current standards. <br />16 <br />Miscellaneous <br />22471 <br />City -Wide Access Control System <br />201 <br />250,000 <br />2,350,000 <br />- <br />Replacement of the failing key card system for all City facilities including card readers. <br />17 <br />Miscellaneous <br />New <br />Storm Lift Station Upgrades <br />441 <br />40,000 <br />260,000 260,000 <br />Condition assessment, design and necessary replacement of components of five storm drain pump <br />Stations. <br />18 <br />Miscellaneous <br />New <br />Storm System Master Plan <br />441 <br />- <br />500,000 <br />Development of storm drain master plan to identify the maintenance needs, best practices and <br />recommended bud et for maintenance ofthe system . <br />19 <br />Miscellaneous <br />23416 <br />Annual Soundwall Repair & Replacement <br />201 <br />100,000 <br />125,000 <br />125,000 <br />125,000 125,000 <br />Annual funding to repair/replace small sections of damaged soundwall. <br />20 <br />Miscellaneous <br />xx424 <br />City Parking Lots - Resurfacing <br />201 <br />250,000 <br />250,000 <br />250,000 250,000 <br />Annual funding to resurface city -owned parking lots. <br />Miscellaneous <br />17556 <br />201 <br />1,000,000 <br />21 <br />West Bound Bernal Ave @ 1St Street <br />E1,300,000 <br />Transportation <br />17556 <br />211 <br />Project scope can be reduced to remove monument signage and portions of protected intersection <br />22 <br />Transportation <br />20565 <br />Nevada Street <br />201 <br />3,000,000 <br />TIFF revenue shortfall removed construction funding for project. Project is designed and ready for <br />Mid <br />construction. The n e i hborhood was activel involved Burin the desi n rocess. <br />23 <br />Miscellaneous <br />Term <br />Library Fire Control <br />201 <br />1,100,000 <br />Existing fire control system is old and annot be expanded. Has been identified by the Fire <br />Department as not meeting current standards. <br />24 <br />Miscellaneous <br />18437 <br />Valley Ave Soundwall Replacement <br />201 <br />1,000,000 <br />100,000 <br />100,000 <br />100,000 100,000 <br />Reduced from recommended $250k from prior CIP for FY 23 & 24 <br />Page 1 of 2 <br />