Laserfiche WebLink
ATTACHMENT 3 <br />Annual <br />Curb & Gutter Removal/Replacement, CIP <br />23509 <br />Owner: <br />City of Pleasanton <br />Villalobos <br />& Associates <br />Rosas Brothers <br />Concrete <br />CLS/Cervantes <br />Services <br />Landscape <br />RK Engineering, <br />Inc. <br />Kerex Engineering <br />M.R. Construction <br />Nor -Cal Concrete <br />FBD Vanguard Construction, Inc. <br />Paulson Cox <br />Construction <br />Bid Opening: 2:0013M, 02/28/2O23 <br />Engineer's <br />Estimate <br />P.O. Box <br />110004 <br />.1731 Coliseum <br />Way <br />PO BOX <br />321 <br />1485 Bayshore <br />Blvd., #127 <br />P.O. Box 23831 <br />1120 Ninth <br />Avenue <br />P O Box 521 <br />550 Greenville Rd <br />2520Stanwell, <br />Suite 160 <br />Campbell, <br />CA 95011 <br />Oakland, CA 94601 <br />Patterson, <br />CA 95363 <br />San Francisco, <br />CA 94124 <br />Pleasanton Hill, <br />CA 94523 <br />San Mateo, <br />CA 94402 <br />Suisun, CA 94585 <br />Livermore, CA 94550 <br />Concord, <br />CA 94520 <br />US <br />US <br />us <br />US <br />US <br />US <br />Us <br />US <br />US <br />Bid Items <br />Bidder Status: <br />Valid <br />Bidder Status: <br />Valid <br />Bidder Status: <br />Valid <br />Bidder <br />Status: Valid <br />Bidder Status: <br />Valid <br />Bidder Status: <br />Valid <br />BidderSMus: Valid <br />Bidder status: Valid <br />Bidder Status: <br />Valid <br />Item p <br />item Description <br />Quantity <br />Unit o <br />Unit <br />UnPrice <br />Item Total <br />Unit Price <br />Item Total <br />Unit Price <br />hem Tocol <br />UnPeke <br />lam Total <br />Unit Price <br />hem Total <br />Unit Price <br />Item Total <br />Unit Price <br />Item Total <br />Unit Price Item Total <br />Unit Price Item Total <br />Unit Price <br />Item Total <br />1 <br />Remove and Replace (R/R) Curb and Gutter <br />(C/G) Regardless of type <br />425 <br />LF <br />110 <br />$46,750 <br />$52.00 <br />$22,100.00 <br />$93.00 <br />$39,525.00 <br />$65.00 <br />$27,625.00 <br />$83.00 <br />$35,275.00 <br />$115.00 <br />$48,875.00 <br />$130.00 <br />$55,250.00 <br />$68.00 $28,900.00 <br />$70.00 $29,750.00 <br />$175.00 <br />$74,375.00 <br />2 <br />Remove and Replace (R/R) Sidewalk (S/W) <br />$50.00 <br />$160,000.00 <br />and/or Driveway (D/W) <br />3200 <br />SF <br />27 <br />$86,400 <br />$19.00 <br />$60,800.00 <br />$22.50 <br />$72,000.00 <br />$20.00 <br />$64,000.00 <br />$17.00 <br />$54,400.00 <br />$25.00 <br />$80,000.00 <br />$29.35 <br />$93,920.00 <br />$25.00 $80,000.00 <br />$35.00 $112,000.00 <br />3 <br />Remove and Replace (R/R) Case "_" (all <br />cases) ADA Ramp <br />38 <br />EACH <br />6,500 <br />$247,000 <br />$6,000.00 <br />$228,000.00 <br />$6,000.00 <br />$228,000.00 <br />$6,500.00 <br />$247,000.00 <br />$5500.00 <br />$209,000.00 <br />$6,750.00 <br />$256,500.00 <br />$8,000.00 <br />$304,000.00 <br />$7,500.00 $285,000.00 <br />$10,000.00 $380,000.00 <br />$8,000.00 <br />$304,000.00 <br />4 <br />Remove and Replace (R/R) Case "_" (all <br />.cases) Oversize (OS) ADA Ramp <br />4 <br />EACH <br />10,500 <br />$42,000 <br />$5,000.00 <br />$20,000.00 <br />$6,900.00 <br />$27,600.00 <br />$11,000.00 <br />$44,000.00 <br />$7200.00 <br />$28,800.00 <br />$10,000.00 <br />$40,000.00 <br />$11,875.00 <br />$47,500.00 <br />$8,500.00 $34,000.00 <br />$11,000.00 $44,000.00 <br />$10,000.00 <br />$40,000.00 <br />5 <br />Grind Lip and Install ADA Domes <br />24 <br />EACH <br />1,250 <br />$30,000 <br />$1,100.00 <br />$26,400.00 <br />$800.00 <br />$19,200.00 <br />$850.00 <br />$20,400.00 <br />$1700.00 <br />$40,800.00 <br />$1,400.00 <br />$33,600.00 <br />$1,150.00 <br />$27,600.00 <br />$2,100.00 $50,400.00 <br />$890.00 $21,360.00 <br />$3,000.00 <br />$72,000.00 <br />6 <br />Install ADA Domes <br />8 <br />EACH <br />1,100 <br />$8,800 <br />$900.00 <br />$7,200.00 <br />$450.00 <br />$3,600.00 <br />$650.00 <br />$5,200.00 <br />$1600.00 <br />$12,800.00 <br />$950.00 <br />$7,600.00 <br />$875.00 <br />$7,000.00 <br />$1,900.00 $15,200.00 <br />$850.00 $6,800.00 <br />$2,500.00 <br />$20,000.00 <br />7 <br />Remove and Replace Herringbone Center of <br />ADA Ramp & Install ADA Domes <br />6 <br />EACH <br />2,000 <br />$12, 000 <br />$13.00 <br />$78.00 <br />$1,600.00 <br />$9,600.00 <br />$1,200.00 <br />$7,200.00 <br />$1900.00 <br />$11,400.00 <br />$3,300.00 <br />$19,800.00 <br />$2,720.00 <br />$16,320.00 <br />$3,000.00 $18,000.00 <br />$2,000.00 $12,000.00 <br />$3,600.00 <br />$21,600.00 <br />Complete all work associated with ADA <br />8 <br />ramps installation and concrete <br />replacement at Valley View Elementary per <br />1 <br />LS <br />47,000 <br />$47,000 <br />$26,850.00 <br />$26,850.00 <br />$45,000.00 <br />$45,000.00 <br />$46,000.00 <br />$46,000.00 <br />$57000.00 <br />$57,000.00 <br />$45,000.00 <br />$45,000.00 <br />$70,000.00 <br />$70,000.00 <br />$58,000.00 $58,000.00 <br />$71,835.DO $71,835.00 <br />$60,000.00 <br />$60,000.00 <br />drawing A4-2 <br />Complete all work associated with ADA <br />9 <br />ramps, curb &gutter, install AC and <br />decomposed granite replacement on <br />1 <br />LS <br />21,000 <br />$21,000 <br />$12,500.00 <br />$12,500.00 <br />$25000.00 <br />$25,000.00 <br />$25000.00 <br />$25,000.00 <br />$41000.00 <br />$41,000.00 <br />$30000.00 <br />$30,000.00 <br />$16000.00 <br />$16,000.00 <br />$301000.00 $30,000.00 <br />$32000.00 $32,000.00 <br />$35,000.00 <br />$35,000.00 <br />'Vineyard Avenue per drawing A7-1 <br />Complete all work associated with ADA <br />ramp, curb & gutter, concrete/AC <br />replacement on Bernal Avenue and Mirador <br />10 <br />Drive per drawing A3-5 and Vineyard <br />1 <br />LS <br />27 000 <br />$27 000 <br />$23,500.00 <br />$23,500.00 <br />$20000.00 <br />$20,000.00 <br />$28000.00 <br />$28,000.00 <br />$33000.00 <br />$33,000.00 <br />$29000.00 <br />$29,000.00 <br />$40000.00 <br />$40,000.00 <br />$35,000.00 $35,000.00 <br />$35000.00 $35,000.00 <br />$45,000.00 <br />$45,000.00 <br />Avenue at Grapevine Drive per drawing A6- <br />3 <br />Complete all work associated with ADA <br />11 <br />ramps, concrete valley gutter, install <br />retaining curbs, and replace stamped <br />1 <br />LS <br />74,000 <br />$74, 000 <br />$48,500.00 <br />$48,500.00 <br />$73000.00 <br />$73,000.00 <br />$58500.00 <br />$58,500.00 <br />$108000.00 <br />$108,000.00 <br />$67000.00 <br />$67,000.00 <br />$15000.00 <br />$15,000.00 <br />$65,000.00 $65,000.00 <br />$101077.00 $101,077.00 <br />$105,000.00 <br />$105,000.00 <br />concrete per drawing A4-1. <br />12 <br />Remove existing grass, re -grade soil and <br />install sod per drawing A5-1. <br />105 <br />SF <br />15 <br />$1,575 <br />$20.00 <br />$2,100.00 <br />$15.00 <br />$1,575.00 <br />$18.00 <br />$1,890.00 <br />$40.00 <br />$4,200.00 <br />$35.00 <br />$3,675.00 <br />$25.00 <br />$2,625.00 <br />$30.00 $3,150.00 <br />$14.00 $1,470.00 <br />$55.00 <br />$5,775.00 <br />14 <br />Tcmpvrary Asphalt (Regardless of Depth) <br />1485 <br />SF <br />18 <br />$26,730 <br />$12.00 <br />$17,820.00 <br />$16.00 <br />$23,760.00 <br />$18.00 <br />$26,730.00 <br />$17.00 <br />$25,245.00 <br />$20.00 <br />$29,700.00 <br />$16.15 <br />$23,982.75 <br />$25.00 $37,125.00 <br />$25.00 $37,125.00 <br />$25.00 <br />$37,125.00 <br />Total Bid <br />Amount <br />$ 670,255 <br />$495,848.00 <br />$587,860.00 <br />$601,545.00 <br />$660,920.00 <br />$690,750.00 <br />$719,197.75 <br />$739,775.00 <br />5884,417.00 <br />$979,875.00 <br />