<br />Annual
<br />Curb & Gutter Removal/Replacement, CIP
<br />23509
<br />Owner:
<br />City of Pleasanton
<br />Villalobos
<br />& Associates
<br />Rosas Brothers
<br />Concrete
<br />CLS/Cervantes
<br />Services
<br />Landscape
<br />RK Engineering,
<br />Inc.
<br />Kerex Engineering
<br />M.R. Construction
<br />Nor -Cal Concrete
<br />FBD Vanguard Construction, Inc.
<br />Paulson Cox
<br />Construction
<br />Bid Opening: 2:0013M, 02/28/2O23
<br />Engineer's
<br />Estimate
<br />P.O. Box
<br />110004
<br />.1731 Coliseum
<br />Way
<br />PO BOX
<br />321
<br />1485 Bayshore
<br />Blvd., #127
<br />P.O. Box 23831
<br />1120 Ninth
<br />Avenue
<br />P O Box 521
<br />550 Greenville Rd
<br />2520Stanwell,
<br />Suite 160
<br />Campbell,
<br />CA 95011
<br />Oakland, CA 94601
<br />Patterson,
<br />CA 95363
<br />San Francisco,
<br />CA 94124
<br />Pleasanton Hill,
<br />CA 94523
<br />San Mateo,
<br />CA 94402
<br />Suisun, CA 94585
<br />Livermore, CA 94550
<br />Concord,
<br />CA 94520
<br />US
<br />US
<br />us
<br />US
<br />US
<br />US
<br />Us
<br />US
<br />US
<br />Bid Items
<br />Bidder Status:
<br />Valid
<br />Bidder Status:
<br />Valid
<br />Bidder Status:
<br />Valid
<br />Bidder
<br />Status: Valid
<br />Bidder Status:
<br />Valid
<br />Bidder Status:
<br />Valid
<br />BidderSMus: Valid
<br />Bidder status: Valid
<br />Bidder Status:
<br />Valid
<br />Item p
<br />item Description
<br />Quantity
<br />Unit o
<br />Unit
<br />UnPrice
<br />Item Total
<br />Unit Price
<br />Item Total
<br />Unit Price
<br />hem Tocol
<br />UnPeke
<br />lam Total
<br />Unit Price
<br />hem Total
<br />Unit Price
<br />Item Total
<br />Unit Price
<br />Item Total
<br />Unit Price Item Total
<br />Unit Price Item Total
<br />Unit Price
<br />Item Total
<br />1
<br />Remove and Replace (R/R) Curb and Gutter
<br />(C/G) Regardless of type
<br />425
<br />LF
<br />110
<br />$46,750
<br />$52.00
<br />$22,100.00
<br />$93.00
<br />$39,525.00
<br />$65.00
<br />$27,625.00
<br />$83.00
<br />$35,275.00
<br />$115.00
<br />$48,875.00
<br />$130.00
<br />$55,250.00
<br />$68.00 $28,900.00
<br />$70.00 $29,750.00
<br />$175.00
<br />$74,375.00
<br />2
<br />Remove and Replace (R/R) Sidewalk (S/W)
<br />$50.00
<br />$160,000.00
<br />and/or Driveway (D/W)
<br />3200
<br />SF
<br />27
<br />$86,400
<br />$19.00
<br />$60,800.00
<br />$22.50
<br />$72,000.00
<br />$20.00
<br />$64,000.00
<br />$17.00
<br />$54,400.00
<br />$25.00
<br />$80,000.00
<br />$29.35
<br />$93,920.00
<br />$25.00 $80,000.00
<br />$35.00 $112,000.00
<br />3
<br />Remove and Replace (R/R) Case "_" (all
<br />cases) ADA Ramp
<br />38
<br />EACH
<br />6,500
<br />$247,000
<br />$6,000.00
<br />$228,000.00
<br />$6,000.00
<br />$228,000.00
<br />$6,500.00
<br />$247,000.00
<br />$5500.00
<br />$209,000.00
<br />$6,750.00
<br />$256,500.00
<br />$8,000.00
<br />$304,000.00
<br />$7,500.00 $285,000.00
<br />$10,000.00 $380,000.00
<br />$8,000.00
<br />$304,000.00
<br />4
<br />Remove and Replace (R/R) Case "_" (all
<br />.cases) Oversize (OS) ADA Ramp
<br />4
<br />EACH
<br />10,500
<br />$42,000
<br />$5,000.00
<br />$20,000.00
<br />$6,900.00
<br />$27,600.00
<br />$11,000.00
<br />$44,000.00
<br />$7200.00
<br />$28,800.00
<br />$10,000.00
<br />$40,000.00
<br />$11,875.00
<br />$47,500.00
<br />$8,500.00 $34,000.00
<br />$11,000.00 $44,000.00
<br />$10,000.00
<br />$40,000.00
<br />5
<br />Grind Lip and Install ADA Domes
<br />24
<br />EACH
<br />1,250
<br />$30,000
<br />$1,100.00
<br />$26,400.00
<br />$800.00
<br />$19,200.00
<br />$850.00
<br />$20,400.00
<br />$1700.00
<br />$40,800.00
<br />$1,400.00
<br />$33,600.00
<br />$1,150.00
<br />$27,600.00
<br />$2,100.00 $50,400.00
<br />$890.00 $21,360.00
<br />$3,000.00
<br />$72,000.00
<br />6
<br />Install ADA Domes
<br />8
<br />EACH
<br />1,100
<br />$8,800
<br />$900.00
<br />$7,200.00
<br />$450.00
<br />$3,600.00
<br />$650.00
<br />$5,200.00
<br />$1600.00
<br />$12,800.00
<br />$950.00
<br />$7,600.00
<br />$875.00
<br />$7,000.00
<br />$1,900.00 $15,200.00
<br />$850.00 $6,800.00
<br />$2,500.00
<br />$20,000.00
<br />7
<br />Remove and Replace Herringbone Center of
<br />ADA Ramp & Install ADA Domes
<br />6
<br />EACH
<br />2,000
<br />$12, 000
<br />$13.00
<br />$78.00
<br />$1,600.00
<br />$9,600.00
<br />$1,200.00
<br />$7,200.00
<br />$1900.00
<br />$11,400.00
<br />$3,300.00
<br />$19,800.00
<br />$2,720.00
<br />$16,320.00
<br />$3,000.00 $18,000.00
<br />$2,000.00 $12,000.00
<br />$3,600.00
<br />$21,600.00
<br />Complete all work associated with ADA
<br />8
<br />ramps installation and concrete
<br />replacement at Valley View Elementary per
<br />1
<br />LS
<br />47,000
<br />$47,000
<br />$26,850.00
<br />$26,850.00
<br />$45,000.00
<br />$45,000.00
<br />$46,000.00
<br />$46,000.00
<br />$57000.00
<br />$57,000.00
<br />$45,000.00
<br />$45,000.00
<br />$70,000.00
<br />$70,000.00
<br />$58,000.00 $58,000.00
<br />$71,835.DO $71,835.00
<br />$60,000.00
<br />$60,000.00
<br />drawing A4-2
<br />Complete all work associated with ADA
<br />9
<br />ramps, curb &gutter, install AC and
<br />decomposed granite replacement on
<br />1
<br />LS
<br />21,000
<br />$21,000
<br />$12,500.00
<br />$12,500.00
<br />$25000.00
<br />$25,000.00
<br />$25000.00
<br />$25,000.00
<br />$41000.00
<br />$41,000.00
<br />$30000.00
<br />$30,000.00
<br />$16000.00
<br />$16,000.00
<br />$301000.00 $30,000.00
<br />$32000.00 $32,000.00
<br />$35,000.00
<br />$35,000.00
<br />'Vineyard Avenue per drawing A7-1
<br />Complete all work associated with ADA
<br />ramp, curb & gutter, concrete/AC
<br />replacement on Bernal Avenue and Mirador
<br />10
<br />Drive per drawing A3-5 and Vineyard
<br />1
<br />LS
<br />27 000
<br />$27 000
<br />$23,500.00
<br />$23,500.00
<br />$20000.00
<br />$20,000.00
<br />$28000.00
<br />$28,000.00
<br />$33000.00
<br />$33,000.00
<br />$29000.00
<br />$29,000.00
<br />$40000.00
<br />$40,000.00
<br />$35,000.00 $35,000.00
<br />$35000.00 $35,000.00
<br />$45,000.00
<br />$45,000.00
<br />Avenue at Grapevine Drive per drawing A6-
<br />3
<br />Complete all work associated with ADA
<br />11
<br />ramps, concrete valley gutter, install
<br />retaining curbs, and replace stamped
<br />1
<br />LS
<br />74,000
<br />$74, 000
<br />$48,500.00
<br />$48,500.00
<br />$73000.00
<br />$73,000.00
<br />$58500.00
<br />$58,500.00
<br />$108000.00
<br />$108,000.00
<br />$67000.00
<br />$67,000.00
<br />$15000.00
<br />$15,000.00
<br />$65,000.00 $65,000.00
<br />$101077.00 $101,077.00
<br />$105,000.00
<br />$105,000.00
<br />concrete per drawing A4-1.
<br />12
<br />Remove existing grass, re -grade soil and
<br />install sod per drawing A5-1.
<br />105
<br />SF
<br />15
<br />$1,575
<br />$20.00
<br />$2,100.00
<br />$15.00
<br />$1,575.00
<br />$18.00
<br />$1,890.00
<br />$40.00
<br />$4,200.00
<br />$35.00
<br />$3,675.00
<br />$25.00
<br />$2,625.00
<br />$30.00 $3,150.00
<br />$14.00 $1,470.00
<br />$55.00
<br />$5,775.00
<br />14
<br />Tcmpvrary Asphalt (Regardless of Depth)
<br />1485
<br />SF
<br />18
<br />$26,730
<br />$12.00
<br />$17,820.00
<br />$16.00
<br />$23,760.00
<br />$18.00
<br />$26,730.00
<br />$17.00
<br />$25,245.00
<br />$20.00
<br />$29,700.00
<br />$16.15
<br />$23,982.75
<br />$25.00 $37,125.00
<br />$25.00 $37,125.00
<br />$25.00
<br />$37,125.00
<br />Total Bid
<br />Amount
<br />$ 670,255
<br />$495,848.00
<br />$587,860.00
<br />$601,545.00
<br />$660,920.00
<br />$690,750.00
<br />$719,197.75
<br />$739,775.00
<br />5884,417.00
<br />$979,875.00