Laserfiche WebLink
City of Pleasanton—Stoneridge Mall Residential Project <br />Section 15183 Checklist/15164 Addendum CEQA Checklist <br /> <br /> <br />FirstCarbon Solutions 81 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480017/Consistency Checklist/21480017 Stoneridge Mall Residential Project Checklist <br />Addendum_Updated.docx <br />Conclusion <br />The proposed project would not result in any Biological Resources impacts beyond those considered <br />in the Prior EIR. All impacts continue to be less than significant with the implementation of <br />mitigation as identified. <br />The proposed project is consistent with the development evaluated in the certified Prior EIR and <br />would not result in any new impacts or increase the severity of any previously identified impacts as <br />compared to what was already identified and disclosed, either individually or cumulatively. <br />Further environmental analysis is not required because: <br />• No peculiar impacts that are not substantially mitigated have been identified as a result of <br />the proposed project or its site. Application of uniformly applied General Plan and <br />Housing Element policies, implementation of relevant Prior EIR mitigation measures, and <br />standards along with regulations of the City of Pleasanton and incorporation of identified <br />project design features will ensure impacts are below the level of significance. <br />• There are no potentially significant impacts that were not analyzed as significant in the <br />Prior EIR. <br />• There are no potentially significant off-site and/or cumulative impacts that were not <br />discussed by the Prior EIR. <br />• No substantial new information has been identified that results in an impact that is more <br />severe than anticipated by the Prior EIR. <br />