Laserfiche WebLink
City of Pleasanton—Stoneridge Mall Residential Project <br />Section 15183 Checklist/15164 Addendum Introduction <br /> <br /> <br />FirstCarbon Solutions 5 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480017/Consistency Checklist/21480017 Stoneridge Mall Residential Project Checklist <br />Addendum_Updated.docx <br />The proposed project would not amend the zoning and would be consistent with the applicable <br />density after the application of the Density Bonus Law (California Government Code 65915), which <br />allows for measured increases in density beyond the allowed limits for development of affordable <br />housing units.2 The Prior EIR is a comprehensive, long-term planning document that specifically <br />includes the project site (and related off-site construction area), which is intended to guide <br />development consistent with the planning policies, requirements and standards of the Housing <br />Element in order to implement the land use vision set forth in the General Plan. The proposed <br />project has been anticipated in City planning documents and regulations and the project site was <br />identified as part of a larger housing opportunity site known as Site 3 in the Prior EIR. As part of the <br />Housing Element, a portion of Site 3 (including the proposed project site) was designated for <br />“Planned Unit Development (PUD) – Mixed-Use,” with a residential density of 40 units/acre (Exhibits <br />5 and 6). Accordingly, the proposed project meets the requirements of this section. <br />15183(d)(2): An EIR was certified by the lead agency for the zoning action, the <br />community plan, or the general plan. <br />The Housing Element and rezoning was approved pursuant to the Prior EIR, certified on January 4, <br />2012. The proposed project is within the scope of and is consistent with the relevant provisions of <br />the adopted Housing Element and the certified Prior EIR, and also is consistent with the General Plan <br />and General Plan EIR. Therefore, for the purposes of this analysis, the certified Prior EIR and General <br />Plan EIR establish the development density and zoning for the project site. Accordingly, the proposed <br />project meets the requirements of this section. <br />1.4.2 - 15164 Findings: An Addendum is appropriate because none of the <br />conditions requiring a subsequent review have occurred. <br />CEQA Guidelines Section 15164, subd. (a) provides that the lead agency or a responsible agency shall <br />prepare an Addendum to a previously certified Environmental Impact Report or Negative Declaration <br />(ND) if some changes or additions are necessary but none of the conditions described in CEQA <br />Guidelines Section 15162 calling for preparation of a subsequent EIR or ND have occurred (CEQA <br />Guidelines § 15164 (a)). It further states, an Addendum need not be circulated for public review but <br />can be included in or attached to the Final EIR or ND (CEQA Guidelines § 15164 (c)). In addition, the <br />decision-making body shall consider the Addendum with the Final EIR prior to making a decision on <br />the proposed project (CEQA Guidelines § 15164 (d)). Finally, an agency must also include a brief <br />explanation of the decision not to prepare a subsequent EIR or ND pursuant to Section 15162 (CEQA <br />Guidelines § 15164 (e)). <br />Consequently, and in accordance with CEQA Guidelines Section 15162(a), once an EIR or ND has <br />been certified for a project, no subsequent EIR or ND is required under CEQA unless, based on <br />substantial evidence, one or more of the following: <br /> <br />2 California Government Code. Title 7. Planning and Land Use [65000-66499.58]. Division 1.Planning and Zoning [65000-66301] <br />Chapter 4.3. Density Bonuses and Other Incentives [65915-65918]. 6