Laserfiche WebLink
Table 2 Water Demand Estimates <br />Stoneridge Apartments Project <br />City of Pleasanton <br />PRELIMINARY <br />Land Use Units Unit Water <br />Use Factor <br />Maximum Day <br />Demand <br />Residential (DU)(gpd/DU)(gpd)(gpm)(gpm) <br />Multi Family 360 200 72,000 50.0 95.0 <br />Total 72,000 50.0 95.0 <br />Fire Flow <br />Multi-Family Residential 2,500 gpm for 2 hours <br />Notes:11/21/2022 <br />1. Maximum day demand factor = 1.9 x ADD <br />2. Unit factor per Kimley-Horn staff 11/18/22 <br />Total Design Flow (ADD)