Laserfiche WebLink
<br />Revised July 2022 Page 10 of 10 <br /> <br />SF Bay <br />Region <br />Requirements <br />All Projects <br />25. Stormwater Management. For projects creating <br />and/or replacing more than 2,500 square-feet of <br />impervious surface, will the Project incorporate on-site <br />stormwater management consistent with the NPDES <br />permit and City stormwater management requirements? <br />Yes☐ <br />No☐ <br />N/A☐ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />Overall Sustainability <br />Urban Forest <br />CAP 2.0 <br />(P13) All Projects <br />26. Tree Planting. If planting is proposed, will the Project <br />include climate-adapted plantings? If trees are removed, <br />will the Project include replacement climate-adapted <br />trees? Indicate the plan sheet(s) where tree information <br />is provided. <br />Yes☐ <br />No☐ <br />N/A☐ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />Wildfire Prevention <br />CAP 2.0 <br />(S9) All Projects <br />27. Wildfire Prevention and Preparation. Will the <br />Project incorporate a wildfire-defensible space, fire <br />hardening retrofits, and commit to fire prevention through <br />site maintenance (e.g., regularly cleaning out rain <br />gutters) and preparation? Voluntary <br />Yes☐ <br />No☐ <br />N/A☐ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />