My WebLink
|
Help
|
About
|
Sign Out
3_Exhibit B
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2023
>
02-22
>
3_Exhibit B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2023 1:15:46 PM
Creation date
2/16/2023 1:06:44 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/22/2023
DESTRUCT DATE
15Y
Document Relationships
3
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2023\02-22
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HCM 6th Signalized Intersection Summary Cumulative Conditions <br />15: Johnson Dr & Stoneridge Dr Timing Plan: AM PEAK <br />Stoneridge Mall Residential Project 6:00 am 05/06/2010 Existing + Approved + Stoneridge Residential Synchro 10 Report <br />Page 10 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Volume (veh/h) 290 1829 20 10 2279 120 10 10 10 60 10 220 <br />Future Volume (veh/h) 290 1829 20 10 2279 120 10 10 10 60 10 220 <br />Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 <br />Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 0.99 1.00 1.00 <br />Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Work Zone On Approach No No No No <br />Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 <br />Adj Flow Rate, veh/h 312 1967 22 11 2451 129 11 11 11 65 0 244 <br />Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 <br />Percent Heavy Veh, %2 2 2 2 2 2 2 2 2 2 2 2 <br />Cap, veh/h 320 2134 24 53 2468 130 56 30 30 333 0 562 <br />Arrive On Green 0.06 0.41 0.41 0.03 0.39 0.39 0.03 0.04 0.04 0.09 0.00 0.11 <br />Sat Flow, veh/h 5023 5204 58 1781 6299 331 1781 855 855 3563 0 3161 <br />Grp Volume(v), veh/h 312 1286 703 11 1876 704 11 0 22 65 0 244 <br />Grp Sat Flow(s),veh/h/ln1674 1702 1858 1781 1609 1804 1781 0 1710 1781 0 1581 <br />Q Serve(g_s), s 6.8 39.4 39.5 0.7 42.5 42.8 0.7 0.0 1.4 1.9 0.0 7.6 <br />Cycle Q Clear(g_c), s 6.8 39.4 39.5 0.7 42.5 42.8 0.7 0.0 1.4 1.9 0.0 7.6 <br />Prop In Lane 1.00 0.03 1.00 0.18 1.00 0.50 1.00 1.00 <br />Lane Grp Cap(c), veh/h 320 1396 762 53 1891 707 56 0 61 333 0 562 <br />V/C Ratio(X)0.98 0.92 0.92 0.21 0.99 1.00 0.20 0.00 0.36 0.20 0.00 0.43 <br />Avail Cap(c_a), veh/h 320 1396 762 81 1891 707 113 0 605 333 0 1346 <br />HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Upstream Filter(I)0.61 0.61 0.61 0.32 0.32 0.32 1.00 0.00 1.00 1.00 0.00 1.00 <br />Uniform Delay (d), s/veh51.4 30.8 30.8 52.1 33.3 33.4 51.9 0.0 51.8 46.0 0.0 40.3 <br />Incr Delay (d2), s/veh 33.1 7.6 12.6 0.6 10.0 18.2 1.7 0.0 3.6 0.3 0.0 0.5 <br />Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 <br />%ile BackOfQ(50%),veh/ln3.8 16.7 19.2 0.3 17.4 21.2 0.3 0.0 0.6 0.8 0.0 3.0 <br />Unsig. Movement Delay, s/veh <br />LnGrp Delay(d),s/veh 84.5 38.4 43.4 52.7 43.3 51.6 53.7 0.0 55.5 46.3 0.0 40.8 <br />LnGrp LOS F D D D D D D A E D A D <br />Approach Vol, veh/h 2301 2591 33 309 <br />Approach Delay, s/veh 46.2 45.6 54.9 42.0 <br />Approach LOS D D D D <br />Timer - Assigned Phs 1 2 3 4 5 6 7 8 <br />Phs Duration (G+Y+Rc), s9.0 49.1 5.4 15.6 11.0 47.1 13.2 7.9 <br />Change Period (Y+Rc), s 5.7 * 5.7 4.0 4.9 4.0 5.7 4.9 * 4.9 <br />Max Green Setting (Gmax), s5.0 * 43 5.0 38.0 7.0 41.4 5.0 * 38 <br />Max Q Clear Time (g_c+I1), s2.7 41.5 2.7 9.6 8.8 44.8 3.9 3.4 <br />Green Ext Time (p_c), s 0.0 1.6 0.0 1.2 0.0 0.0 0.0 0.0 <br />Intersection Summary <br />HCM 6th Ctrl Delay 45.7 <br />HCM 6th LOS D <br />Notes <br />User approved volume balancing among the lanes for turning movement. <br />* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
The URL can be used to link to this page
Your browser does not support the video tag.