My WebLink
|
Help
|
About
|
Sign Out
3_Exhibit B
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2023
>
02-22
>
3_Exhibit B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2023 1:15:46 PM
Creation date
2/16/2023 1:06:44 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/22/2023
DESTRUCT DATE
15Y
Document Relationships
3
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2023\02-22
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HCM 6th Signalized Intersection Summary Cumulative Conditions <br />11: Foothill Rd & Laurel Creek Dr/Stoneridge Dr Timing Plan: AM PEAK <br />Stoneridge Mall Residential Project 6:00 am 05/06/2010 Existing + Approved + Stoneridge Residential Synchro 10 Report <br />Page 6 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Volume (veh/h) 20 40 60 205 40 307 30 382 130 400 431 10 <br />Future Volume (veh/h) 20 40 60 205 40 307 30 382 130 400 431 10 <br />Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 <br />Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 1.00 1.00 0.99 1.00 1.00 <br />Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Work Zone On Approach No No No No <br />Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 <br />Adj Flow Rate, veh/h 23 47 70 238 47 357 35 444 151 465 501 12 <br />Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 <br />Percent Heavy Veh, %2 2 2 2 2 2 2 2 2 2 2 2 <br />Cap, veh/h 38 82 122 310 536 1402 54 729 295 663 1304 582 <br />Arrive On Green 0.02 0.12 0.11 0.17 0.29 0.29 0.03 0.21 0.19 0.19 0.37 0.37 <br />Sat Flow, veh/h 1781 676 1007 1781 1870 2790 1781 3554 1564 3456 3554 1585 <br />Grp Volume(v), veh/h 23 0 117 238 47 357 35 444 151 465 501 12 <br />Grp Sat Flow(s),veh/h/ln1781 0 1683 1781 1870 1395 1781 1777 1564 1728 1777 1585 <br />Q Serve(g_s), s 0.7 0.0 3.6 6.9 1.0 4.0 1.1 6.2 4.7 6.8 5.6 0.3 <br />Cycle Q Clear(g_c), s 0.7 0.0 3.6 6.9 1.0 4.0 1.1 6.2 4.7 6.8 5.6 0.3 <br />Prop In Lane 1.00 0.60 1.00 1.00 1.00 1.00 1.00 1.00 <br />Lane Grp Cap(c), veh/h 38 0 204 310 536 1402 54 729 295 663 1304 582 <br />V/C Ratio(X)0.60 0.00 0.57 0.77 0.09 0.25 0.65 0.61 0.51 0.70 0.38 0.02 <br />Avail Cap(c_a), veh/h 656 0 639 1149 536 1402 656 2075 888 2228 1304 582 <br />HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Uniform Delay (d), s/veh26.3 0.0 22.7 21.4 14.2 7.7 26.0 19.6 19.8 20.5 12.7 11.0 <br />Incr Delay (d2), s/veh 5.4 0.0 0.9 3.7 0.0 0.0 4.8 0.8 1.4 1.0 0.2 0.0 <br />Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 <br />%ile BackOfQ(50%),veh/ln0.3 0.0 1.4 2.8 0.4 1.0 0.5 2.2 1.7 2.4 1.8 0.1 <br />Unsig. Movement Delay, s/veh <br />LnGrp Delay(d),s/veh 31.7 0.0 23.6 25.0 14.2 7.7 30.9 20.4 21.2 21.5 12.8 11.0 <br />LnGrp LOS C A C C B A C C C C B B <br />Approach Vol, veh/h 140 642 630 978 <br />Approach Delay, s/veh 25.0 14.6 21.2 16.9 <br />Approach LOS C B C B <br />Timer - Assigned Phs 1 2 3 4 5 6 7 8 <br />Phs Duration (G+Y+Rc), s14.4 15.1 5.2 19.6 5.6 23.9 13.4 11.3 <br />Change Period (Y+Rc), s 4.0 5.7 4.0 5.3 4.0 5.7 4.0 * 5.3 <br />Max Green Setting (Gmax), s35.0 30.0 20.0 10.0 20.0 10.0 35.0 * 20 <br />Max Q Clear Time (g_c+I1), s8.8 8.2 2.7 6.0 3.1 7.6 8.9 5.6 <br />Green Ext Time (p_c), s 1.6 1.3 0.0 0.5 0.0 0.6 0.8 0.2 <br />Intersection Summary <br />HCM 6th Ctrl Delay 17.9 <br />HCM 6th LOS B <br />Notes <br />User approved pedestrian interval to be less than phase max green. <br />* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
The URL can be used to link to this page
Your browser does not support the video tag.