My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
022123
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2023 1:27:21 PM
Creation date
2/15/2023 1:27:20 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/21/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br /> City Council identified pickleball courts as a priority during the work plan prioritization <br /> process in early 2021. The design and construction costs for pickleball courts were <br /> included in the Annual Court Resurfacing Project's budget, to be completed in <br /> conjunction with the FY 2022/23 Annual Court Resurfacing Project, CIP No. 22744. <br /> The project consisted of resurfacing the basketball court, resurfacing the tennis courts, <br /> converting two of the four tennis courts into six pickleball courts, and replacing the court <br /> equipment and furnishings. Both the basketball and tennis courts were resurfaced using <br /> a slipsheet overlay system. <br /> The City prepared bid documents in April/May 2022 and advertised for construction bids <br /> in May 2022. On June 9, 2022, the City Council awarded the contract to Mauri Concrete <br /> Construction Company, Inc., in the amount of$442,532. Council authorized the Director <br /> of Engineering to approve change orders up to the project contingency amount of <br /> $45,000. <br /> DISCUSSION <br /> Construction began on September 16, 2022, and was completed on November 3, 2022. <br /> One change order in the amount of$6,084 was issued for additional concrete <br /> replacement work as necessary at the perimeter of the basketball courts. During <br /> construction, it was determined the concrete band was too cracked and depressed to <br /> provide a sufficient edge for the slipsheet system so staff directed additional concrete <br /> be removed and replaced. The change order dollar amount was based upon the unit <br /> cost of concrete work in Mauri Concrete Company's bid. A balancing change order was <br /> also issued deducting $1,000 from the contract amount because one bench wasn't <br /> available for installation. The change order work increased the total construction <br /> contract amount to $447,616. Additionally, the City expended $28,192 to purchase court <br /> equipment, furnishings, and other miscellaneous expenses. <br /> The project was completed under the amount budgeted to the satisfaction of the <br /> Director of Engineering. It is recommended the City Council accept the project as <br /> complete and authorize the City Clerk to file a Notice of Completion with the Alameda <br /> County Recorder. Staff also recommends the remaining budget balance of$37,192 be <br /> returned to the Annual Playgrounds Renovation Project, CIP No. 22745 (Fund 518 — <br /> Park Med) since funds were transferred from CIP 22745 at the time of the construction <br /> contract award to fully fund the court resurfacing project. <br /> Submitted by: Fiscal Review: Approved by: <br /> Stephen Kirkpatrick Susan Hsieh Gerry Beaudin <br /> Director of Engineering Director of Finance City Manager <br /> Attachments: <br /> 1. Funding and Expenditure Summary <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.