My WebLink
|
Help
|
About
|
Sign Out
03
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
022123
>
03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2023 1:25:01 PM
Creation date
2/15/2023 1:23:36 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/21/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Determining Consistency with the CAP <br /> use the CEQA GHG Emissions Analysis Compliance Checklist are not required to quantify reductions <br /> from the strategies included on the checklist, because the reductions from applicable strategies <br /> have already been quantified at a programmatic level in the CAP 2.0. <br /> If a plan/project is consistent with the applicable strategies on the CEQA GHG Emissions Analysis <br /> Compliance Checklist,then the plan/project can streamline from the plan/project-level CEQA GHG <br /> emissions analysis utilizing the programmatic GHG emissions environmental review included in the <br /> adopted IS-ND for the CAP 2.0 pursuant to CEQA Guidelines Section 15183.5(b)(1). <br /> A plan/project that is consistent with all applicable strategies of the CEQA GHG Emissions Analysis <br /> Compliance Checklist would result in less-than-significant GHG emissions and would not result in a <br /> cumulatively considerable impact related to GHG emissions and climate change. In this case,the <br /> analysis of a plan or project's GHG emissions in its respective CEQA review document should include <br /> a qualitative summary of the plan/project's consistency with applicable measures of the CEQA GHG <br /> Emissions Analysis Compliance Checklist and an explanation with substantial evidence of why any <br /> strategies in the checklist are not applicable to the plan/project. <br /> 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.