My WebLink
|
Help
|
About
|
Sign Out
01 SUPPLEMENTAL
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
121522
>
01 SUPPLEMENTAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2023 4:10:07 PM
Creation date
2/2/2023 4:08:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DESTRUCT DATE
15Y
Document Relationships
01
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\121522
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF <br /> ATTACHMENT C <br /> Stoneridge Mall Framework <br /> pLE ASANTON Public Comments <br /> From: Mike Tassano<
[email protected]
> <br /> Sent: Friday, November 18, 2022 11:30 AM <br /> To: Dave Limato <br /> Cc: Shweta Bonn <
[email protected]
>; Mayor and City Council <br /> <
[email protected]
>; Gerry Beaudin<
[email protected]
>; Ellen Clark <br /> <
[email protected]
>; Matthew Nelson<
[email protected]
> <br /> Subject: : Request for Information on Traffic for the next Stoneridge Framework Meeting <br /> David, <br /> Thank you for your email. I appreciate the advanced request for"overhead"visuals. We don't actually <br /> have anything to that level of detail regarding the Stoneridge Mall Framework. We are still in the <br /> process of evaluating the impacts of the additional housing and not yet to the point where we can show <br /> what (if any) modifications would be necessary. <br /> I do, however, have the overhead for the Stoneridge Drive at Johnson Drive intersection that is <br /> underway.This plan has a second westbound to northbound lane added to the existing flyover and you <br /> can see the construction crew preparing this work which will begin in earnest in April of next year(we <br /> are not able to build over waterways in the winter). Caltrans did not require us to make any alterations <br /> to the freeway mainline,so the 2 lane on ramp will merge down to a single lane and the existing <br /> configuration prior to the 680 northbound mainline. <br /> I have my staff looking for an overhead that more clearly depicts the changes that we have shared at <br /> previous public meetings. I included the overheard that I have here on my computer and thought I <br /> would share it with you. <br /> Please let me know if you have questions on the design or need assistance reading the plan. <br /> Mike Tassano <br /> Deputy Director of Community Development, Transportation <br /> D: 925-931-5670 <br /> F: 925-931-5478 <br /> mtassano(a citvofpleasantonca.gov <br /> City of Pleasanton I P.O. Box 520, Pleasanton, CA 94566 <br /> From: Ellen Holmgren <
[email protected]
> <br /> Sent:Tuesday, November 15, 2022 2:36 PM <br /> To: Dave Limato; Mayor and City Council<
[email protected]
> <br />
The URL can be used to link to this page
Your browser does not support the video tag.