Laserfiche WebLink
AUGUSTIN BERNAL MOUNTAIN BIKE TRAIL PROJECT DRAFT INITIAL STUDY <br /> PERMITS AND APPROVALS REQUIRED <br /> The following approval would be required to carry out the proposed project. No approvals or permits from local, <br /> state,or federal agencies are anticipated to be necessary. <br /> • Golden Eagle HOA:Access Easement <br /> Environmental Factors Potentially Affected <br /> As demonstrated in this Initial Study,the proposed project would result in potentially significant impacts in several <br /> environmental resource areas,however all of the project's impacts would be reduced to a less than significant level <br /> with implementation of the mitigation measures included in this Initial Study. Thus, while several of the <br /> environmental factors listed below would be potentially affected by this project, none would involve any impact that <br /> is a "Potentially Significant Impact,"as indicated by the checklist on the following pages and thus all of the following <br /> checkboxes are blank. <br /> ❑ Aesthetics ❑ Agriculture and ❑ Air Quality <br /> Forestry Resources <br /> ❑ Biological Resources ❑ Cultural Resources ❑ Energy <br /> ❑ Geology and Soils ❑ Greenhouse Gas ❑ Hazards and Hazardous <br /> Emissions Materials <br /> ❑ Hydrology and Water Quality ❑ Land Use and ❑ Mineral Resources <br /> Planning <br /> ❑ Noise ❑ Population and ❑ Public Services <br /> Housing <br /> ❑ Recreation ❑ Transportation ❑ Tribal Cultural Resources <br /> ❑ Utilities and Service Systems ❑ Wildfire ❑ Mandatory Findings of <br /> Significance <br /> 12956 <br /> DUDEK 13 April 2022 <br />