My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
020723
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2023 1:53:33 PM
Creation date
2/2/2023 1:52:20 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/7/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUGUSTIN BERNAL MOUNTAIN BIKE TRAIL PROJECT DRAFT INITIAL STUDY <br /> Construction Activities and Methods <br /> Construction of the proposed project would require minor grading and vegetation clearing alongthe entire bike trail <br /> alignment. The trailbed and construction area for the proposed trail and the trails to be decommissioned covers <br /> approximately 0.76 acres.This includes the trailbed and trails to be decommissioned within the City's existing 237- <br /> acre Augustin Bernal Community Park and the portion of trailbed within the Golden Eagle HOA property. The City <br /> would need to obtain an access easement across the Golden Eagle HOA property to allow for trail construction and <br /> long-term use. <br /> Construction activities and methodology would include the following: <br /> • Clearing and grubbing of shrubs and groundcover vegetation and trimming of tree branches that could <br /> impede the vertical clearance along the trail. No tree removal is proposed.Cleared and grubbed vegetation <br /> may be chipped and spread on site or may be removed and disposed of off-site. Tree branches may be <br /> used on site to define trail edges and block access to existing unofficial trail spurs. <br /> • Some rocks,existing downed tree branches,and existing downed tree trunks may be moved off of the trail <br /> surface and used to define trail edges, create trail features (jumps), and/or block access to existing <br /> unofficial trail spurs. <br /> • Grading the trail surface to create a trailbed, berms, turns,jumps, and other trail features, as well as to <br /> create grade changes to provide for appropriate erosion and drainage control. <br /> • It is assumed that construction activities would be performed continuously duringdaylight hours throughout <br /> a 3-month period between May 1 and October 15 in 2022 or 2023. <br /> Decommissioning the user-created trails would include the following: <br /> • Removing existing rock and any logs or wood edging where it occurs along the existing trail edges and <br /> redistributing those materials within the trail decommissioning area to mimic a random and natural layout. <br /> • Refilling holes resulting from the decommissioning operations. <br /> • Shallow-ripping soils to decrease compaction. <br /> • Broadcasting native plant species seed mix to revegetate decommissioned areas. The seed mix would <br /> include common yarrow (achillea millifolium), California brome (bromus carinatus), Miner's lettuce <br /> (claytonia perfoliate), blue wildrye (elymus glaucus), Douglas iris (iris douglasiana), sticky monkeyflower <br /> (mimulus aurantiacus), purple needlegrass(nasella pulchra), blue eyed grass(sisyrinchium bellum), native <br /> clover(trifolium ciliolaturm), and small fescue(vulpia microstachys). <br /> Grading <br /> To construct the proposed project, nearly the entire trail would require grading to some extent, with grading cuts <br /> generally at a maximum of 0.5 feet in depth. It is expected that the majority of the soil removed would be reused <br /> on site to create grade changes, berms, and other trail features. It is estimated that the proposed project would <br /> require approximately 68 cubic yards of earthwork.Soils cuts and fills would be balanced on site,so no soil export <br /> would be needed.Up to 15 cubicyards of dirt and/or rock would be imported to build berms and other trail features. <br /> 12956 <br /> DUDEK 10 April 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.