My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
020723
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2023 1:53:33 PM
Creation date
2/2/2023 1:52:20 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/7/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUGUSTIN BERNAL MOUNTAIN BIKE TRAIL PROJECT DRAFT INITIAL STUDY <br /> General Plan Land Use Designation and Zoning: <br /> • General Plan Land Use Designation: Parks and Recreation,Agriculture and Grazing <br /> • Zoning: Public, Planned Unit Development - Low Density Residential <br /> PROJECT DESCRIPTION <br /> Project Design and Use <br /> The Augustin Bernal Mountain Bike Trail Project(project) would consist of development of an approximately 0.7- <br /> mile-long (3,700 linear feet) downhill-only technical mountain bike trail within and adjacent to Augustin Bernal <br /> Community Park in the City of Pleasanton (City). Mountain bike riders already use the proposed trail location and <br /> have created several trails through this unofficial use. The purpose of the current project is to provide an <br /> appropriately designed and engineered trail to minimize erosion and user risks, and to reduce potential <br /> pedestrian/bicyclist conflicts on the multi-use trails in Augustin Bernal Community Park. <br /> The Pleasanton Trails Master Plan (City of Pleasanton 2019a) recognizes that the City's extensive trails system <br /> provides unique and highly valued recreation opportunities to its residents,contributes to the community identity, <br /> and supports public health.Although the City's trail network is robust and offers connections to regional facilities, <br /> the Master Plan identifies that there are important"gaps and unimproved segments that reduce the usability and <br /> enjoyability of the trails"(City of Pleasanton 2019a).As discussed in Section 1.6 and Appendix B of the Pleasanton <br /> Trails Master Plan, through the public outreach conducted during development of the plan, the City identified <br /> resident preferences and desired facilities,which includes more natural trail surfaces, closing gaps in the existing <br /> trail network, and constructing more trails dedicated to mountain bikes to meet user demand and reduce trail <br /> conflicts. In questionnaire responses, construction of the Augustin Bernal Mountain Bike Trail was specifically <br /> identified as one of the community's top priorities (City of Pleasanton 2019a). Thus, this project is proposed for <br /> construction because it is a high-priority connection that would contribute to the City's comprehensive vision for the <br /> full potential of the Pleasanton trail system and relieve pedestrian/bicyclist conflicts on the multi-use trails in <br /> Augustin Bernal Community Park. <br /> As shown in Figure 3, Proposed Trail Alignment,the trail would include a range of features,such as turns, banks, <br /> jumps, and grade changes, and provide alternate trails or ride-around space on challenging features to <br /> accommodate trail riders with less experience.Grade reversals and berms would be used to provide for appropriate <br /> drainage and minimize erosion. Several sections of existing user-created trails and trail spurs would be <br /> decommissioned.Wayfinding signage would also be provided along the trail to identify that the trail is restricted to <br /> mountain bike use and to identify challenge levels for particular trail segments.The trail width would vary based on <br /> grade,topography, trail features, and needs for maintenance access. It would range from approximately 4 feet to <br /> 20 feet. Examples of these features are shown in Figure 4,Typical Trail Design.The complete trail design plans are <br /> provided in Appendix A. <br /> The proposed trailhead would be on the Ridgeline Trail,which continues north through Augustin Bernal Community <br /> Park and south into the southern portion of Pleasanton Ridge Regional Park. It would also be near Thermalito Trail, <br /> which continues south into Pleasanton Ridge Regional Park.The proposed trail terminus is at the Augustin Bernal <br /> Community Park staging area. As shown in Figure 5, Existing Trails, beginning at the staging area, cyclists could <br /> follow existing multi-use trails to reach the proposed trail, specifically Golden Eagle Trail to Valley View Trail to <br /> Ridgeline Trail. <br /> 12956 <br /> DUDEK 8 April 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.