Laserfiche WebLink
AUGUSTIN BERNAL MOUNTAIN BIKE TRAIL PROJECT DRAFT INITIAL STUDY <br /> Table 2-1. Mitigation Measures <br /> Measure <br /> Number Measure Text <br /> • Best management practices for spill prevention shall be incorporated into <br /> project plans and specifications and shall contain measures for secondary <br /> containment and safe handling procedures. <br /> • A spill kit shall be maintained on site throughout all construction activities and <br /> shall contain appropriate items to absorb, contain, neutralize,or remove <br /> hazardous materials stored or used in large quantities during construction. <br /> • Project plans and specifications shall identify construction staging areas and <br /> designated areas where equipment refueling, lubrication,and maintenance <br /> may occur.Areas designated for refueling, lubrication,and maintenance of <br /> equipment shall be approved by the City. <br /> • In the event of any spill or release of any chemical or wastewater during <br /> construction,the contractor shall immediately notify the City of Pleasanton. <br /> • Hazardous substances shall be handled in accordance with Title 22 of the <br /> California Code of Regulations, which prescribes measures to appropriately <br /> manage hazardous substances, including requirements for storage, spill <br /> prevention and response and reporting procedures. <br /> 12956 <br /> DUDEK 6 April 2022 <br />