My WebLink
|
Help
|
About
|
Sign Out
14
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
020723
>
14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2023 1:36:10 PM
Creation date
2/2/2023 1:36:03 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/7/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF ATTACHMENT <br /> 1fti� ntnr 11 <br /> n p : 1 ..1- <br /> PLEASANTON., <br /> COMMENT SUMMARY <br /> Location: Lions Wayside Park <br /> Date: June 22, 2022 <br /> Project: Lions Wayside and Delucchi Parks Master Plan Update, CIP No. 06716 <br /> Subject: Public Outreach Event <br /> Attendees: City (Matt Gruber,Zack Reda) <br /> Below is a summary of the comments received from residents and other meeting attendees for the <br /> proposed Lions Wayside and Delucchi Parks Master Plan Update. <br /> The public outreach took place from 6:00-7:30pm at Lions Wayside Park on Wednesday June 22, 2022. <br /> Staff presented the conceptual design from the master plan adopted in 2014 along with the 2022 updated <br /> plan. Additionally, staff advertised for the community survey and passed out flyers with a link to the <br /> survey and an image of the updated conceptual plan. Staff spoke with approximately 30-40 people. <br /> Below is a summary of comments regarding the project. <br /> Design Comments <br /> 1. Remove the paths between the proposed bandstand and the Firehouse Arts Center so that it is <br /> one large lawn/audience area. <br /> 2. The main audience area should not have paths, be playable, and inviting. <br /> 3. Do not reduce the grass area in Delucchi Park! <br /> 4. Install a bathroom in Lions Wayside Park. The bathroom in Delucchi Park is too far and has <br /> insufficient capacity for events in the parks. <br /> 5. Relocate or remove the pathways in the large lawn/audience areas to create a contiguous grass <br /> area. <br /> 6. Specify more pennanent trash receptacles. <br /> 7. Don't break up the grass area at Delucchi Park. <br /> 8. Add more picnic tables. <br /> ENGINEERING DEPARTMENT P.O. BOX 520, Pleasanton, CA 94566-0802 <br /> Engineering Construction Services Landscape Architecture <br /> 200 Old Bernal Ave. 157 Main Street 200 Old Bernal Ave. <br /> (925)931-5650 (925)931-S680 (925)931-5650 <br /> Fax: 931-5479 Fax: 931-5484 Fax: 931-5479 <br />
The URL can be used to link to this page
Your browser does not support the video tag.