My WebLink
|
Help
|
About
|
Sign Out
14
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
020723
>
14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2023 1:36:10 PM
Creation date
2/2/2023 1:36:03 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/7/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF ATTACHMENT <br /> 07 nu�r <br /> PLEASANTON, <br /> COMMENT SUMMARY <br /> Location: Pleasanton Summer Concert Series <br /> Date: June 17, 2022 <br /> Project: Lions Wayside and Delucchi Parks Master Plan Update, CIP No. 06716 <br /> Subject: Public Outreach Event <br /> Attendees: City (Matt Gruber, Sarah Hosterman,Zack Reda) <br /> Below is a summary of the comments received from residents and other summer concert series visitors for <br /> the proposed Lions Wayside and Delucchi Parks Master Plan Update. <br /> The public outreach took place from 5:30-7:30pm at the Summer Concert Series held in Lions Wayside <br /> Park on Friday June 17, 2022. <br /> Staff presented the conceptual design from the master plan adopted in 2014 along with the 2022 updated <br /> plan. Additionally, staff advertised for the community survey,the upcoming outreach meeting on June <br /> 22"d, and passed out flyers with a link to the survey and an image of the updated conceptual plan. Staff <br /> spoke with approximately 50 people. <br /> Below is a summary of comments regarding the project. <br /> Deshm Comments <br /> 1. A 9-year-old said that they really like the new concept plan. <br /> 2. Pleasanton does not look good at all. The creek should be covered. Clayton and San Ramon are <br /> outcompeting Pleasanton as far as aesthetics. <br /> 3. Install paving or grass in front of the bandstand. Do not install dirt or decomposed granite as it <br /> tracks everywhere and creates a mess. <br /> 4. Leave some room in front of the band stand for the crowd to dance. <br /> 5. Maximize the lawn area. <br /> 6. Focus on having the correct design rather than the cost of the design. In the end, once the <br /> project is built, nobody is going to remember how much it cost,they are just going to remember <br /> how successful the design is. Sacrificing the design because of the cost is going to limit the <br /> success of the park and is not in the best interest of future park users. <br /> ENGINEERING DEPARTMENT P.O. BOX 520, Pleasanton, CA 94566-0802 <br /> Engineering Construction Services Landscape Architecture <br /> 200 Old Bernal Ave. 157 Main Street 200 Old Bernal Ave. <br /> (925)931-5650 (925)931-5680 (925)931-5650 <br /> Fax: 931-5479 Fax: 931-5484 Fax: 931-5479 <br />
The URL can be used to link to this page
Your browser does not support the video tag.