My WebLink
|
Help
|
About
|
Sign Out
14
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
020723
>
14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2023 1:36:10 PM
Creation date
2/2/2023 1:36:03 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/7/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Outreach Event Summary <br /> May 14, 2022 <br /> Page 2 <br /> 8. Don't bisect the grass areas with too many pathways—our kids want to run. <br /> 9. The relocation of the creek creates a psychological barrier for potential visitors that are driving <br /> by on First Street. <br /> 10.Keep an open area for frisbee and free play. <br /> 11.Don't install decomposed granite in front of the bandstand because it causes a mess and kicks <br /> up too much dust—install pavers or pavement instead. <br /> 12.I'd rather see the creek daylighted than put underground so think the new design is an <br /> improvement. <br /> 13.Lions Wayside and Delucchi Parks are an eyesore now—I am excited about this design. <br /> 14.Like the trail continuing through the park at the back of the firehouse. <br /> Parkine <br /> 15.Make the parking lot a multi-story parking garage or provide underground parking so the space <br /> could be utilized for more recreation (multiple comments). <br /> 16.Install the parking lot underground and provide restaurants and a playground over the parking <br /> lot so that families could play and dine together. <br /> 17.An underground parking lot would be too expensive. <br /> 18.Don't need an underground parking lot or restaurant.There already are plenty of restaurants <br /> downtown—just provide a good connection between the park and downtown. <br /> 19.Limit any parking to on-grade or underground. <br /> 20.The street parking on the west side of First Street will help prevent kids from running out into <br /> the street from the park/creek. <br /> Tree Comments <br /> 21.The more trees that are installed,the better. <br /> 22.The mature trees are what makes Pleasanton wonderful. <br /> 23.The City needs to prioritize saving all the redwood trees in the City before they spend money on <br /> renovating Lions Wayside and Delucchi Parks. <br /> Operations <br /> 24.Don't water the lawn before events! <br /> 25.We should close down Railroad and/or Neal Street for special events and have food trucks on <br /> the street(s). <br />
The URL can be used to link to this page
Your browser does not support the video tag.