Laserfiche WebLink
ATTACHMENT 1 <br /> LIGHTNING Quote and Order <br /> M O T O R S <br /> QuoteDate <br /> 11/10/2023 11385 <br /> Lightning Systems,Inc. <br /> 815 14th St SW <br /> Suite A100 <br /> Loveland CO 80537 Pleasanton ZEV 3 10A1 WC 80 kWh ADA Van <br /> United States <br /> C015864 City of Pleasanton Jay ingram <br /> Email:" Qasantonca.aov Email: <br /> Phone:9 5 931-5348 Phone.9 5-931-5348 <br /> Jay Ingram Zack Silva <br /> City of Pleasanton Ci of Pleasanton-Operation Service Department <br /> 400 Old Bernal Avenue 3333 Busch Road <br /> Pleasanton CA 94566 Pleasanton CA 94566 <br /> United States United States <br /> ThroughValid .. .. .. <br /> 2/10/2023 Roger VartanianDep on Order, Bal EXW Mfg's Loc <br /> Upon Invoice <br /> Ite rn Description Unit Cost Quantity USD Total Price <br /> T-350HD_22_PAS Lightning eMotors FT3-86 Transit,2022, $130,950.00 1 $130,950.00 <br /> SVAN_148_1036 Passenger Van, 10360GVWR,without <br /> 0_80kWh_NOSTE Step, Lightning Provided, US <br /> P_INT_US <br /> LIA3 Full Lightning Insights vehicle telematics $1,995.00 1 $1,995.00 <br /> access-3 yrs <br /> CA HVIP Base CA HVIP Base Voucher ($45,000.00) 1 ($45,000.00) <br /> Voucher-Class <br /> 3 <br /> Misc Upfit ADA 10A1 WC Bus Door Up Fit as per spec $40,764.00 1 $40,764.00 <br /> Service sheet and floor plan <br /> Charging Kit- 19.2 kW AC Wallbox,240V/80A/1 P,J1772, $2,995.00 1 $2,995.00 <br /> Level 2 Single 25ft Cable, Ethernet,WIFI,4G, <br /> RFID,OLED Display&7.2 kW AC Cord, <br /> 120V/1 5A/1 P or 240V/32A/1 P,J1772, <br /> Single 25ft Cable,2" LCD Display, NEMA <br /> 5-15&14-50 Adapters,Carrying Bag <br /> LIAC1 AC charger management software-1 yr $240.00 1 $240.00 <br /> CSF1T One time charger configuration/setup fee $240.00 1 $240.00 <br /> Total $132,184.00 <br /> Quote#1385 1 of 3 <br />