My WebLink
|
Help
|
About
|
Sign Out
PC-2022-12
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2022
>
PC-2022-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2023 4:03:18 PM
Creation date
1/24/2023 4:02:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
11/9/2022
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a. Electrical conduit and cable pull strings shall be installed from the roof/attic area to the <br />building's main electrical panels ; <br />b. An area shall be provided near the electrical panel for the installation of an "inverter" <br />required to convert the direct current output from the photovoltaic panels to alternating <br />current ; <br />c. Engineer the roof trusses to handle an additional load as determined by a structural <br />engineer to accommodate the additional weight of a prototypical photovoltaic system <br />beyond that anticipated for roofing ; <br />d . Plumbing shall be installed for solar-water heating ; and <br />e . Space shall be provided for solar-heating tank . <br />22. GREEN BUILDING -RESIDENTIAL NEW CONSTRUCTION : Pr ior to building permit issuance , a list <br />of the green building measures used in the design , covered by this approval, shall be provided to the <br />Planning Division for review and approval by the Director of Community Development. The new <br />home covered by this approval shall be designed to achieve a "certified rating " of a minimum of 50 <br />total points , achieving at least the minimum points in each category , using BuildltGreen 's current <br />Green Points rating system . The green building measures shall be shown on the building permit <br />plans submitted to the Building and Safety Division . Each proposed point identified shall have a <br />notation indicating the sheet(s) the point can be found . A special inspection by the Planning Division <br />shall be coordinated with regards to exterior materials . Prior to building permit final , all of the green <br />building measures indicated on the approved checklist shall be inspected and approved by either the <br />City of Pleasanton , a third-party rater , or the applicant shall provide written verification by the project <br />engineer, architect , landscape architect, or designer. (Per PMC 17.50) <br />Construction Practices and Noticing <br />23 . WORK HOURS : All demolition and construction activities , inspections , plan checking , material <br />delivery , staff assignment or coordination , etc., shall be limited to the hours of 8 a.m. to 5 p.m., <br />Monday through Saturday . No construction shall be allowed on State or Federal Holidays or <br />Sundays . The Director of Community Development may allow earlier "start times " or later "stop times " <br />for specific construction activities , e .g ., concrete pouring . All construction equipment shall meet <br />Department of Motor Vehicles (OMV) noise standards and shall be equipped with muffling devices . <br />Prior to construction , the hours of construction shall be posted on site . <br />24 . CONSTRUCTION PARKING : Campers , trailers , motor homes , or any other similar vehicle are not <br />allowed on the construction site except when needed as sleeping quarters for a security guard <br />subject to receipt of a temporary conditional use permit (per PMC 18 .116.01 0.E). <br />25 . CONSTRUCTION TRAILERS: A construction trailer shall be allowed to be placed on the project site <br />for daily administration/coordination purposes during the construction period . <br />26 . CONSTRUCTION AND PARKING MANAGEMENT PLAN: The appl icant shall prepare a construct ion <br />and parking management plan to address impacts and parking demands during the construction <br />phase of the project. The construction and parking management plan shall be subject to review and <br />approval by the City Traffic Engineer and Director of Community Development prior to issuance of a <br />demolition permit, or the first building permit, whichever comes first. The following items shall be <br />incorporated into the construction and parking management plan : <br />PUD-145 <br />a. Show truck route for construction and delivery trucks that does not include <br />neighborhood res idential streets , unless approved by the City Traffic Eng i neer; <br />b. Show construction vehicles and equipment parking area , materials storage , temporary <br />fencing , construction trailer location , and construction contractors/workers parking <br />area. <br />Planning Commission <br />Page 4 of 17
The URL can be used to link to this page
Your browser does not support the video tag.