My WebLink
|
Help
|
About
|
Sign Out
02 ATTACHMENT 2
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
012623 SPECIAL
>
02 ATTACHMENT 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2023 5:43:46 PM
Creation date
1/20/2023 5:26:34 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/26/2023
DESTRUCT DATE
15Y
Document Relationships
02
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2023\012623 SPECIAL
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
563
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sites Inventory and Methodology City of Pleasanton | B-3 <br />B.1.3 Data <br />The sites inventory analysis used data provided by the City, such as GIS data and building <br />permit/entitlement information. The following is an overview of the data used: <br />• City and County-level parcel GIS data, including General Plan land use designation, <br />zoning district, ownership, age of building, improvement value, land value, existing <br />building square footage and height, existing number of units, etc. <br />• ADU building permits issued <br />• Entitled projects and projects in the entitlement phase <br />• Prior Housing Element site inventories <br />• Annual Progress Reports to HCD during the 5th Cycle <br />• Zoning Code and Downtown Specific Plan allowed density and floor area ratio <br />standards (FAR) <br />Section B.2 Future Residential Development <br />Potential <br />B.2.1 Accessory Dwelling Units <br />New state laws in effect since January 1, 2018 have significantly eased the development <br />standards and streamlined the approval process for Accessory Dwelling Units (ADUs). As a <br />result, the City has experienced an increasing trend in ADU building permit issuance and <br />production in recent years. Table B-1 shows the number of building permits issued for ADUs <br />in Pleasanton from 2018 through 2021. <br />Table B-1: Permitted ADUs – Building Permits Issued <br />Year Permitted ADUs <br />2018 8 <br />2019 11 <br />2020 10 <br />2021 17 <br />Total 46 <br />Annual Average 11.5 <br />Source: City of Pleasanton <br />
The URL can be used to link to this page
Your browser does not support the video tag.