Laserfiche WebLink
City of Pleasanton 2023-2031 (6th Cycle) Housing Element Update <br />CEQA Findings of Fact and Statement of Overriding Considerations <br /> <br /> <br />56 FirstCarbon Solutions <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480022/FOF/21480022 Pleasanton Housing Element FOF.docx <br />1.5.12 - Population and Housing <br />Potential Effect <br />Impact POP-1: Development consistent with the Housing Element Update, rezonings, and General <br />Plan and Specific Plan Amendments would not induce substantial unplanned population growth in <br />an area, either directly (for example, by proposing new homes and businesses) or indirectly (for <br />example, through extension of roads or other infrastructure). (Draft Program EIR, Page 3.12-15). <br />Findings: Less than significant impact. <br />Facts in Support of Findings: Because the Housing Element Update would provide sufficient sites <br />to accommodate the RHNA allocation for the City, the population growth associated with <br />development of those sites would be consistent with the forecast growth in Plan Bay Area 2050. <br />Pleasanton is part of Superdistrict 15, East Alameda County, which includes Pleasanton, Dublin, <br />Livermore and the eastern portion of unincorporated Alameda County. This Superdistrict is projected <br />to grow by 60,000 households for a total of 132,000 households by 2050 (interim year forecasts are <br />not provided). The increase of 5,965 units in the RHNA would be well within the forecast total. The <br />Housing Element Update would allow for projected population growth; however, for the reasons <br />discussed throughout this impact analysis, it would not be unplanned. Housing would serve all <br />income levels, including very low-, low-, moderate-, and above-moderate-income residents and <br />special needs residents. The City affords preference in administration of its affordable housing <br />programs to persons living and/or working in Pleasanton, in an effort to provide as many <br />opportunities as possible for residents already living within the city; therefore a significant <br />proportion of the new affordable housing created would house existing versus new residents. The <br />Housing Element Update identifies sites for future residential development based on seven criteria <br />as previously discussed. These criteria assisted the City in identifying the properties most suitable for <br />the potential sites for rezoning. <br />Many of the Housing Element Update’s policies and programs guide population growth within the <br />city through 2031. Development within the potential sites for housing would be required to abide by <br />policies and programs to ensure that new development or redevelopment does not induce <br />substantial additional unanticipated or unplanned population growth, either directly or indirectly. <br />Overall, the Housing Element Update accounts for the 2023-2031 RHNA for Pleasanton as prescribed <br />by ABAG, plus a buffer of additional units. Program 1.1 in the Housing Element Update requires <br />water, sewer, and dry utilities be provided at the potential sites for housing zoned for at least 30 <br />units per acre. Program 1.7 facilitates the development of the large Kiewit (21a and b) and <br />Stoneridge Mall (Site 2) properties which must occur in conjunction with preparation of and <br />adoption of a Specific Plan, Master Plan, Planned Unit Development (PUD) or similar to ensure <br />adequate services are provided to service those developments. Program 1.10 requires the <br />annexation of Sites 1 (Lester) and 22 (Merritt) to the City prior to development of housing. The <br />annexation process would ensure adequate services within the city would be available for future <br />residential development on those sites. Policy 2.5 requires the City to apply for federal, State, and <br />regional grants for mixed-use development near transit centers. Policy 4.2 requires the City to ensure <br />adequate infrastructure is available to support future planned residential growth. Policy 5.1 <br />mandates that the City provide housing in residential, mixed-use and infill areas, especially near high