Laserfiche WebLink
ATTACHMENT 2 <br />Bid Summary <br />Val Vista Underdrain Improvements, CIP No. 21457 <br />Bid Opening: 12/9/2022 <br />Engineer's Estimate <br />Golden Bay <br />Inc <br />Unit Price <br />Construction, <br />Tota] <br />DPI, <br />Unit Price <br />Inc. <br />Total <br />Cazadero <br />Inc. <br />Unit Price <br />Construction, <br />Total <br />Pacific Underground <br />Construction, <br />Unit Pnce <br />$135,00000 <br />$5,20000 <br />$15,000.00 <br />$15,000,00 <br />$220.00 <br />$224.00 <br />$224.00 <br />$22400 <br />$22400 <br />$255 00 <br />$18800 <br />$31000 <br />$15700 <br />$13,62500 <br />$24,28700 <br />$14,300.00 <br />$13,625 00 <br />$1,52100 <br />$2,50000 <br />$85000 <br />54,086.00 <br />54,646.00 <br />$1,688.00 <br />:$1,:817.00 <br />Inc. <br />Total <br />S135,00000 <br />$5,200.00 <br />$15,00000 <br />$15,00000 <br />1 S63,58000 <br />$17,47200 <br />$56,896.00 <br />$71,23200 <br />$21,280 00 <br />$119,08500 <br />$54,52000 <br />$105,40000 <br />$18,055 00 <br />$54,50000 <br />$24,28700 <br />585,800 00 <br />540,87500 <br />$15,21000 <br />$5,00000 <br />57,650.00 <br />$8,172 00 <br />$9,29200 <br />$1,68800 <br />$14,536.00 <br />Suulutaaq, <br />Unit Price <br />$159,500.00 <br />$10,694.00 <br />$38,78700 <br />S29,31100 <br />$725.00 <br />544600 <br />$288.00 <br />$27800 <br />S505 00 <br />$281 00 <br />$26500 <br />S21400 <br />$219.00 <br />$13,85900 <br />$13,85900 <br />$16,750.00 <br />$16,75000 <br />$2,853 00 <br />$1,92900 <br />$1,20000 <br />$3,988 00 <br />S4,59200 <br />54,05900 <br />52,500.00 <br />Inc_ <br />Total <br />$159,50000 <br />510,694.00 <br />$38,787.00 <br />$29,311.00 <br />$209,525.00 <br />$34,788.00 <br />1-,150.00 <br />$73,15200 <br />S88,40400 <br />547.975 00 <br />$131,22700 <br />$76,85000 <br />$72,76000 <br />525,185 00 <br />$55,436.00 <br />513,859.00 <br />$100,500 00 <br />$50,250 00 <br />$28,530 00 <br />$3,85800 <br />510,80000 <br />$7,97600 <br />$9,19400 <br />54,05900 <br />520,000.00 <br />TKerex Engineering <br />Unit Price <br />$72,500.000 <br />$10,000.00 <br />$7,500.00 <br />$25,000.00 <br />$275.00 <br />$500,00 <br />S37500 <br />$375 00 <br />$500 00 <br />S37500 <br />$13000 <br />$13000 <br />$13000 <br />$9,50000 <br />$15,00000 <br />595.000 00 <br />$12,500 00 <br />$1,00000 <br />$2,500 00 <br />S1,00000 <br />S7750000 <br />S7,50000 <br />$2,000.00 <br />$1,000.00 <br />Total <br />$72,500.00 <br />$10,00000 <br />$7,50000 <br />$25,00000 <br />$79,47500 <br />$39,00000 <br />595,250 00 <br />$119,250.00 <br />547,500 00 <br />$175,125.00 <br />S37.70000 <br />$44,20000 <br />$14,95000 <br />$38,000.00 <br />$15,00000 <br />S570.000 00 <br />S37,500 00 <br />$10,00000 <br />$5,000 00 <br />$9,00000 <br />515,00000 <br />$15,00000 <br />$2,000 00 <br />$8,000.00 <br />Con -Quest Contractors, <br />Unit Price <br />$205,000.00 <br />$25,00000 <br />$20,000.00 <br />$10,000.00 <br />$34000 <br />$425.00 <br />$425.00 <br />$170.00 <br />$535 00 <br />5435 00 <br />$21500 <br />S30000 <br />$150.00 <br />513,50000 <br />518,00000 <br />$13,500.00 <br />515,000.00 <br />$73500 <br />56,500.00 <br />$1,000,00 <br />$3,00000 <br />$3,000.00 <br />$800.00 <br />$1,40000 <br />Inc <br />Total <br />$205,00000 <br />$25,000.00$60,000.00 <br />$20,00000 <br />$10,00000 <br />S98,26000 <br />$33i <br />5107,95Q00 <br />$54,060.00 <br />$50,825,00 <br />$203,145.00 <br />S62,350.00 <br />$102,000.00 <br />S17,25Q00 <br />$54,00000 <br />$18,00000 <br />$81,000 00 <br />$45,000 00 <br />$7,35000 <br />$13,00000 <br />$9,000.00 <br />$6,00000 <br />S6,000.00 <br />$800 00 <br />$11,20000 <br />Graney Pacific, <br />Unit Price <br />$200,00000 <br />525,00000 <br />539,00000 <br />528000 <br />$275.00 <br />$35000 <br />$27500 <br />$46000 <br />$295.00 <br />$10000 <br />5225.00 <br />$175 00 <br />$19,00000 <br />$24,00000 <br />$16,000 00 <br />$21,00000 <br />$2,50000 <br />54,500 00 <br />52,10000 <br />S4,00000 <br />$5,00000 <br />532,000 00 <br />$2,90000 <br />Inc. <br />Total <br />$200,00000 <br />$60,000.00 <br />$25,000.00 <br />$39,00000 <br />580,920.00 <br />$21,450 00 <br />S88,90000 <br />S87,45000 <br />S43,70000 <br />$137,76500 <br />$29,00000 <br />$76,500.00 <br />$20,125 00 <br />$76,00000 <br />$24,00000 <br />$96,000 00 <br />563,000 00 <br />$25,00000 <br />$9,000 00 <br />$18,900.00 <br />S8,00000 <br />$10,00000 <br />$32,000 00 <br />$23,20000 <br />Mountain <br />Unit Price <br />$80,00000 <br />$20,00000 <br />$15,00000 <br />$60.00000 <br />$62500 <br />$35700 <br />$40700 <br />$33200 <br />5432 00 <br />$38000 <br />$20000 <br />$35000 <br />$200 00 <br />$18,00000 <br />$25,00000 <br />$22,00000 <br />$21,000.00 <br />$2,00000 <br />$2,500 00 <br />$1,90000 <br />$5,40000 <br />$5,50000 <br />$2,30000 <br />$1,90000 <br />Cascade, Inc <br />Total <br />TOS Unit of <br />Item No. Quantity Item Description Unit Price Total <br />(Appmximetc) Measure <br />1 i LSIMobilization $ 100,00000 $100,000 <br />$147,07600 $147,07600 <br />$102,264000 $102,26400 <br />$175,000.00 $175,000.00 <br />2 1 LS Erosion and Sediment Control / SWPPP E 20,000 00 $20,000 <br />$10,00000 $10,00000 <br />$110,00000 $110,00000 <br />$22,00000 $22,00000 <br />580,00000 <br />$20,00000 <br />3 1 LS Traffic Control& Construction Signs $ 25,000.00 525,000 <br />$7,00000 $7,000.00 <br />$140,000.00 $140,000.00 <br />$20,00000 $20,000.00 <br />$15,00000 <br />4 1 LS Clearing & Grubbing $ 15,000.00 $15,000 <br />$54,000.00 $54,00000 <br />$28,000.00 $28,000.00 <br />540,000.00 $40,00000 <br />$60,00000 <br />5 289 LF 8 -inch FHDPE SDR 11 using HDD $ 450.00 $130,050 <br />$191.00 $55,199.00 <br />$307.00 $88,72300 <br />$32000 $92,48000 <br />$180,62500 <br />6 78 LF 8 -inch PVC SDR 26 using OT - Up to 4' $ 200.00 $15,600 <br />Cover <br />$22700 $17,70600 <br />$16800 $13,10400 <br />$19000 $14,82000 <br />$27,846 00 <br />7 254 LF 8 -inch PVC SDR 26 using OT - 4' to 8' $ 240.00 560,960 <br />Cover <br />$229.00 $58,166 00 <br />$170.00 543,18000 <br />$220 00 $55,880 00 <br />$103,37800 <br />8 318 LF 8 -inch PVC SDR 26 using OT (Field No 1) S 580.00 $184,440 <br />- 4' to 8' Cover <br />$29400 $90,312.00 <br />$140.00 $44,520.00 <br />$25000 $79,50Q00 <br />$105,57600 <br />9 95 LF 8 -inch PVC SDR 26 using OT - 8' [0 12' $ 600.00 $57,000 <br />Cover <br />$290.00 527,550.00 <br />$25100 $23,845 00 <br />565000 $61,750.00 <br />$41,04000 <br />10 467 LF 8 -inch PVC C-900 SDR 18 using OT - Up $ 27000 $126,090 <br />to 8' Cover <br />$24100 $112,54700 <br />$208.00 $97,13600 <br />$26000 $121,420.00 <br />S177,46000 <br />11 290 LF 2Force Main using OT - Up to 4' Cover Sch (Solvent Welded) PVC $ 18000 $52,200 <br />Forc <br />$20900 $60,610.00 <br />$13000 $37,70000 <br />$200.00 $58,000.00 <br />$58,00000 <br />Joint 2-1J2-ineh Sch 80 (Solvent Welded) <br />12 340 LF PVC Force Main and 1 -inch or 2 -inch Sch $ 230.00 $78,200 <br />40 PVC Electric Conduit using OT - Up to <br />$258.00 $87,720.00 <br />$123.00 541,82000 <br />5260.00 $88,40000 <br />$119,00000 <br />13 115 LF 1 -inch or 2 -inch Sch 40 PVC Electric $ 10000 $11,500 <br />Conduit using OT - Up to 4' Cover <br />$25000 $28,75000 <br />$11600 $13,340.00 <br />$110.00 $12,65000 <br />$23,000 00 <br />14 4 EA Recycled Water Manhole - 4' to 8' Pipe $ 13,000.00 $52,000 <br />Cover <br />$9,500 00 $38,000 00 <br />$6,200 00 $24,800 00 <br />$17,000.00 $68,000 00 <br />$72,00000 <br />15 1 EA Recycled WaterManh°lc-8'to12'Pipe <br />Cover $ 17,000,00 $17,000 <br />$14,00000 $14,000.00 <br />$11,50000 $11,500.00 <br />$25,000.00 $25,000.00 <br />$25,00000 <br />16 6 EA Recycled Water Manhole with Low Flow $ 14000 00 $84000 <br />Weir - Up to 4' Pipe Cover <br />$11,00000 $66 000 00 <br />$6,500 00 $39,000,00 <br />$13,000,00 $78,000.00 <br />$132,00000 <br />17 3 EA Recycled Water Manhole with Low Flow $ 18,000.00 $54,000 <br />Weir - 4' to 8' Pipe Cover <br />515,600 00 $46,800 00 <br />$7,500 00 $22,500.00 <br />$17,000 00 $51,000.00 <br />$63,000.00 <br />Adjust to Grade Existing Catch Basin Grate $ 1,80000 $18 000 <br />18 10 EA / Frame <br />$3,600,00 $36,00000 <br />$1,80000 $18,00000 <br />$1,500.00 $15,00000 <br />$20,000.00 <br />Adjust to Grade and Replace Existing Catch <br />19 2 EA Basin Grate / Frame with New Manhole $ 3,500.00 $7,000 <br />F C <br />$3,900.00 $7,800.00 <br />$2,90000 $5,80000 <br />$3,50000 $7,00000 <br />$5,000 00 <br />20 9 EA Install Screen to Existing Catch Basin Grate S 1,000.00 $9,000 <br />$2,200.00 519,800.00 <br />$900.00 58,10000 <br />$64000 $5,760,00 <br />$17,10000 <br />21 2 EA 8 -inch Recycled Water Isolation Gate Valve - Up to 4' Pipe Cover $ 5,50000 $11,000 <br />$3,100.00 S6,20000 <br />$3,200.00 56,40000 <br />$7,000.00 $14,00000 <br />$10,800.00 <br />22 2 EA 8 -inch Recycled Water Isolation Gale Valve - 4' to 8' Pipe Cover $ 7,500.00 515,000 <br />54,200.00 58,400,00 <br />$3,50000 $7,00000 <br />$7,00000 $14,00000 <br />$11,00000 <br />23 I EA 8 -inch Recycled Water Cleanout - Up to 4' $ 2,000.00 $2,000 <br />Pipe Cover <br />$],800 00 $1,800,00 <br />$1,950.00 $1,950.00 <br />$2,500.00 $2,500.00 <br />$2,30000 <br />24 8 EA 2 -1/2 -inch Recycled - Up to 4' Pipe Cover cycled Water Force Main $ 2,000.00 $16,000 <br />Cleanout <br />51,100.00 58,80000 <br />$],70000 $13,600.00 <br />$1,50000 $12,000,00 <br />$15,20000 <br />Page 1 of 2 <br />