ATTACHMENT 2
<br />Bid Summary
<br />Val Vista Underdrain Improvements, CIP No. 21457
<br />Bid Opening: 12/9/2022
<br />Engineer's Estimate
<br />Golden Bay
<br />Inc
<br />Unit Price
<br />Construction,
<br />Tota]
<br />DPI,
<br />Unit Price
<br />Inc.
<br />Total
<br />Cazadero
<br />Inc.
<br />Unit Price
<br />Construction,
<br />Total
<br />Pacific Underground
<br />Construction,
<br />Unit Pnce
<br />$135,00000
<br />$5,20000
<br />$15,000.00
<br />$15,000,00
<br />$220.00
<br />$224.00
<br />$224.00
<br />$22400
<br />$22400
<br />$255 00
<br />$18800
<br />$31000
<br />$15700
<br />$13,62500
<br />$24,28700
<br />$14,300.00
<br />$13,625 00
<br />$1,52100
<br />$2,50000
<br />$85000
<br />54,086.00
<br />54,646.00
<br />$1,688.00
<br />:$1,:817.00
<br />Inc.
<br />Total
<br />S135,00000
<br />$5,200.00
<br />$15,00000
<br />$15,00000
<br />1 S63,58000
<br />$17,47200
<br />$56,896.00
<br />$71,23200
<br />$21,280 00
<br />$119,08500
<br />$54,52000
<br />$105,40000
<br />$18,055 00
<br />$54,50000
<br />$24,28700
<br />585,800 00
<br />540,87500
<br />$15,21000
<br />$5,00000
<br />57,650.00
<br />$8,172 00
<br />$9,29200
<br />$1,68800
<br />$14,536.00
<br />Suulutaaq,
<br />Unit Price
<br />$159,500.00
<br />$10,694.00
<br />$38,78700
<br />S29,31100
<br />$725.00
<br />544600
<br />$288.00
<br />$27800
<br />S505 00
<br />$281 00
<br />$26500
<br />S21400
<br />$219.00
<br />$13,85900
<br />$13,85900
<br />$16,750.00
<br />$16,75000
<br />$2,853 00
<br />$1,92900
<br />$1,20000
<br />$3,988 00
<br />S4,59200
<br />54,05900
<br />52,500.00
<br />Inc_
<br />Total
<br />$159,50000
<br />510,694.00
<br />$38,787.00
<br />$29,311.00
<br />$209,525.00
<br />$34,788.00
<br />1-,150.00
<br />$73,15200
<br />S88,40400
<br />547.975 00
<br />$131,22700
<br />$76,85000
<br />$72,76000
<br />525,185 00
<br />$55,436.00
<br />513,859.00
<br />$100,500 00
<br />$50,250 00
<br />$28,530 00
<br />$3,85800
<br />510,80000
<br />$7,97600
<br />$9,19400
<br />54,05900
<br />520,000.00
<br />TKerex Engineering
<br />Unit Price
<br />$72,500.000
<br />$10,000.00
<br />$7,500.00
<br />$25,000.00
<br />$275.00
<br />$500,00
<br />S37500
<br />$375 00
<br />$500 00
<br />S37500
<br />$13000
<br />$13000
<br />$13000
<br />$9,50000
<br />$15,00000
<br />595.000 00
<br />$12,500 00
<br />$1,00000
<br />$2,500 00
<br />S1,00000
<br />S7750000
<br />S7,50000
<br />$2,000.00
<br />$1,000.00
<br />Total
<br />$72,500.00
<br />$10,00000
<br />$7,50000
<br />$25,00000
<br />$79,47500
<br />$39,00000
<br />595,250 00
<br />$119,250.00
<br />547,500 00
<br />$175,125.00
<br />S37.70000
<br />$44,20000
<br />$14,95000
<br />$38,000.00
<br />$15,00000
<br />S570.000 00
<br />S37,500 00
<br />$10,00000
<br />$5,000 00
<br />$9,00000
<br />515,00000
<br />$15,00000
<br />$2,000 00
<br />$8,000.00
<br />Con -Quest Contractors,
<br />Unit Price
<br />$205,000.00
<br />$25,00000
<br />$20,000.00
<br />$10,000.00
<br />$34000
<br />$425.00
<br />$425.00
<br />$170.00
<br />$535 00
<br />5435 00
<br />$21500
<br />S30000
<br />$150.00
<br />513,50000
<br />518,00000
<br />$13,500.00
<br />515,000.00
<br />$73500
<br />56,500.00
<br />$1,000,00
<br />$3,00000
<br />$3,000.00
<br />$800.00
<br />$1,40000
<br />Inc
<br />Total
<br />$205,00000
<br />$25,000.00$60,000.00
<br />$20,00000
<br />$10,00000
<br />S98,26000
<br />$33i
<br />5107,95Q00
<br />$54,060.00
<br />$50,825,00
<br />$203,145.00
<br />S62,350.00
<br />$102,000.00
<br />S17,25Q00
<br />$54,00000
<br />$18,00000
<br />$81,000 00
<br />$45,000 00
<br />$7,35000
<br />$13,00000
<br />$9,000.00
<br />$6,00000
<br />S6,000.00
<br />$800 00
<br />$11,20000
<br />Graney Pacific,
<br />Unit Price
<br />$200,00000
<br />525,00000
<br />539,00000
<br />528000
<br />$275.00
<br />$35000
<br />$27500
<br />$46000
<br />$295.00
<br />$10000
<br />5225.00
<br />$175 00
<br />$19,00000
<br />$24,00000
<br />$16,000 00
<br />$21,00000
<br />$2,50000
<br />54,500 00
<br />52,10000
<br />S4,00000
<br />$5,00000
<br />532,000 00
<br />$2,90000
<br />Inc.
<br />Total
<br />$200,00000
<br />$60,000.00
<br />$25,000.00
<br />$39,00000
<br />580,920.00
<br />$21,450 00
<br />S88,90000
<br />S87,45000
<br />S43,70000
<br />$137,76500
<br />$29,00000
<br />$76,500.00
<br />$20,125 00
<br />$76,00000
<br />$24,00000
<br />$96,000 00
<br />563,000 00
<br />$25,00000
<br />$9,000 00
<br />$18,900.00
<br />S8,00000
<br />$10,00000
<br />$32,000 00
<br />$23,20000
<br />Mountain
<br />Unit Price
<br />$80,00000
<br />$20,00000
<br />$15,00000
<br />$60.00000
<br />$62500
<br />$35700
<br />$40700
<br />$33200
<br />5432 00
<br />$38000
<br />$20000
<br />$35000
<br />$200 00
<br />$18,00000
<br />$25,00000
<br />$22,00000
<br />$21,000.00
<br />$2,00000
<br />$2,500 00
<br />$1,90000
<br />$5,40000
<br />$5,50000
<br />$2,30000
<br />$1,90000
<br />Cascade, Inc
<br />Total
<br />TOS Unit of
<br />Item No. Quantity Item Description Unit Price Total
<br />(Appmximetc) Measure
<br />1 i LSIMobilization $ 100,00000 $100,000
<br />$147,07600 $147,07600
<br />$102,264000 $102,26400
<br />$175,000.00 $175,000.00
<br />2 1 LS Erosion and Sediment Control / SWPPP E 20,000 00 $20,000
<br />$10,00000 $10,00000
<br />$110,00000 $110,00000
<br />$22,00000 $22,00000
<br />580,00000
<br />$20,00000
<br />3 1 LS Traffic Control& Construction Signs $ 25,000.00 525,000
<br />$7,00000 $7,000.00
<br />$140,000.00 $140,000.00
<br />$20,00000 $20,000.00
<br />$15,00000
<br />4 1 LS Clearing & Grubbing $ 15,000.00 $15,000
<br />$54,000.00 $54,00000
<br />$28,000.00 $28,000.00
<br />540,000.00 $40,00000
<br />$60,00000
<br />5 289 LF 8 -inch FHDPE SDR 11 using HDD $ 450.00 $130,050
<br />$191.00 $55,199.00
<br />$307.00 $88,72300
<br />$32000 $92,48000
<br />$180,62500
<br />6 78 LF 8 -inch PVC SDR 26 using OT - Up to 4' $ 200.00 $15,600
<br />Cover
<br />$22700 $17,70600
<br />$16800 $13,10400
<br />$19000 $14,82000
<br />$27,846 00
<br />7 254 LF 8 -inch PVC SDR 26 using OT - 4' to 8' $ 240.00 560,960
<br />Cover
<br />$229.00 $58,166 00
<br />$170.00 543,18000
<br />$220 00 $55,880 00
<br />$103,37800
<br />8 318 LF 8 -inch PVC SDR 26 using OT (Field No 1) S 580.00 $184,440
<br />- 4' to 8' Cover
<br />$29400 $90,312.00
<br />$140.00 $44,520.00
<br />$25000 $79,50Q00
<br />$105,57600
<br />9 95 LF 8 -inch PVC SDR 26 using OT - 8' [0 12' $ 600.00 $57,000
<br />Cover
<br />$290.00 527,550.00
<br />$25100 $23,845 00
<br />565000 $61,750.00
<br />$41,04000
<br />10 467 LF 8 -inch PVC C-900 SDR 18 using OT - Up $ 27000 $126,090
<br />to 8' Cover
<br />$24100 $112,54700
<br />$208.00 $97,13600
<br />$26000 $121,420.00
<br />S177,46000
<br />11 290 LF 2Force Main using OT - Up to 4' Cover Sch (Solvent Welded) PVC $ 18000 $52,200
<br />Forc
<br />$20900 $60,610.00
<br />$13000 $37,70000
<br />$200.00 $58,000.00
<br />$58,00000
<br />Joint 2-1J2-ineh Sch 80 (Solvent Welded)
<br />12 340 LF PVC Force Main and 1 -inch or 2 -inch Sch $ 230.00 $78,200
<br />40 PVC Electric Conduit using OT - Up to
<br />$258.00 $87,720.00
<br />$123.00 541,82000
<br />5260.00 $88,40000
<br />$119,00000
<br />13 115 LF 1 -inch or 2 -inch Sch 40 PVC Electric $ 10000 $11,500
<br />Conduit using OT - Up to 4' Cover
<br />$25000 $28,75000
<br />$11600 $13,340.00
<br />$110.00 $12,65000
<br />$23,000 00
<br />14 4 EA Recycled Water Manhole - 4' to 8' Pipe $ 13,000.00 $52,000
<br />Cover
<br />$9,500 00 $38,000 00
<br />$6,200 00 $24,800 00
<br />$17,000.00 $68,000 00
<br />$72,00000
<br />15 1 EA Recycled WaterManh°lc-8'to12'Pipe
<br />Cover $ 17,000,00 $17,000
<br />$14,00000 $14,000.00
<br />$11,50000 $11,500.00
<br />$25,000.00 $25,000.00
<br />$25,00000
<br />16 6 EA Recycled Water Manhole with Low Flow $ 14000 00 $84000
<br />Weir - Up to 4' Pipe Cover
<br />$11,00000 $66 000 00
<br />$6,500 00 $39,000,00
<br />$13,000,00 $78,000.00
<br />$132,00000
<br />17 3 EA Recycled Water Manhole with Low Flow $ 18,000.00 $54,000
<br />Weir - 4' to 8' Pipe Cover
<br />515,600 00 $46,800 00
<br />$7,500 00 $22,500.00
<br />$17,000 00 $51,000.00
<br />$63,000.00
<br />Adjust to Grade Existing Catch Basin Grate $ 1,80000 $18 000
<br />18 10 EA / Frame
<br />$3,600,00 $36,00000
<br />$1,80000 $18,00000
<br />$1,500.00 $15,00000
<br />$20,000.00
<br />Adjust to Grade and Replace Existing Catch
<br />19 2 EA Basin Grate / Frame with New Manhole $ 3,500.00 $7,000
<br />F C
<br />$3,900.00 $7,800.00
<br />$2,90000 $5,80000
<br />$3,50000 $7,00000
<br />$5,000 00
<br />20 9 EA Install Screen to Existing Catch Basin Grate S 1,000.00 $9,000
<br />$2,200.00 519,800.00
<br />$900.00 58,10000
<br />$64000 $5,760,00
<br />$17,10000
<br />21 2 EA 8 -inch Recycled Water Isolation Gate Valve - Up to 4' Pipe Cover $ 5,50000 $11,000
<br />$3,100.00 S6,20000
<br />$3,200.00 56,40000
<br />$7,000.00 $14,00000
<br />$10,800.00
<br />22 2 EA 8 -inch Recycled Water Isolation Gale Valve - 4' to 8' Pipe Cover $ 7,500.00 515,000
<br />54,200.00 58,400,00
<br />$3,50000 $7,00000
<br />$7,00000 $14,00000
<br />$11,00000
<br />23 I EA 8 -inch Recycled Water Cleanout - Up to 4' $ 2,000.00 $2,000
<br />Pipe Cover
<br />$],800 00 $1,800,00
<br />$1,950.00 $1,950.00
<br />$2,500.00 $2,500.00
<br />$2,30000
<br />24 8 EA 2 -1/2 -inch Recycled - Up to 4' Pipe Cover cycled Water Force Main $ 2,000.00 $16,000
<br />Cleanout
<br />51,100.00 58,80000
<br />$],70000 $13,600.00
<br />$1,50000 $12,000,00
<br />$15,20000
<br />Page 1 of 2
<br />
|