Laserfiche WebLink
12/22/2022 <br /> B15 Equipment Installation of 5-12 Age 1 $61,061.00 $61,061.00 $0.00 <br /> MREC <br /> 22-1172—ValVistaCommunityPark-005 <br /> to plan per specification (prevailing <br /> wages,footing spoils disposed off-site) <br /> B03 2-5 Area Wood Fiber 1 $5,107.00 $5,107.00 $0.00 <br /> Removal/Stockpile/Reinstall-Includes <br /> labor and equipment to stockpile and <br /> reinstall approx.86 CY existing EWF <br /> figured @ 12"depth,area 1,795 SF <br /> B03 5-12 Area Wood Fiber 1 $11,118.00 $11,118.00 $0.00 <br /> Removal/Stockpile/Reinstall-Includes <br /> labor and equipment to stockpile and <br /> reinstall approx. 227 CY existing EWF <br /> figured @ 12"depth,area 4,716 SF <br /> Sub Total: $297,082.00 <br /> Total Freight: $10,911.50 <br /> Total Estimated Tax: $16,614.74 <br /> Grand Total: $324,608.24 <br /> Company: <br /> Signature: <br /> Name: <br /> Date: <br /> OPTIONAL PRODUCT <br /> The below product(s)are optional and do not contribute to the quote totals,estimated taxes and freight amounts. <br /> Installation Services Trucking and Bobcat Access Required <br /> Product Code Description Rate Total Estimated Tax( if <br /> applicable) <br /> C17 2-5 and 5-12 Area Wood Fiber 1 $4,858.00 $4,858.00 $0.00 <br /> Surfacing Top-Off Install Only(non- <br /> blow in)-Includes installation only of <br /> owner provided approx. 134 CY EWF <br /> to top-off existing. <br /> Val Vista Community Park <br /> MIRACLE PLAYSYSTEMS, INC. — PO BOX 263,ALAMO,CA 94507 — (800)879-7730 — (510)893-2163 (FAX) <br /> CSL:981433 (Exp Date 03/23) — DIR: 1000015853 <br /> Page 3 of 5 <br />