My WebLink
|
Help
|
About
|
Sign Out
ORD 1909
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1901 - 2000
>
ORD 1909
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:23:46 PM
Creation date
10/14/2004 1:38:28 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
10/5/2004
DOCUMENT NO
ORD 1909
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
37. Prior to commencement of the installation of subdivision improvements, the applicant <br /> shall submit for review and approval by the Fire, Police, and Planning Departments <br /> the details of the split rail fence to be located across the driveway/EVA on the <br /> property line in between Lots 1 and 2. <br /> <br />38. The storm drainage from each lot shall be directed to an approved storm drain system <br /> in accordance with Sections 2907(b)(5) and 7012(d) of the 1988 Uniform unless <br /> otherwise approved by the Building Official and City Engineer. <br /> <br />39. The applicant shall keep the site free of fire hazards from the start of lumber <br /> construction until final inspection. <br /> <br />40. Prior to any framing construction, the applicant shall provide adequate fire protection <br /> facilities, including but not limited to surface roads and a water supply and water flow <br /> meeting Fire Department standards to suppress a major fire. If, prior to any framing <br /> construction, the applicant proposes in writing an alternate method of fire protection, <br /> the Fire Chief may allow the alternative method. <br /> <br />Engineering <br /> <br />41. The applicant shall submit a refundable cash bond for hazard and erosion control prior <br /> to issuance of an Engineering or Building Department permit. The amount of this <br /> bond will be determined by the City Engineer. <br /> <br />42. The project developer shall submit a final grading and drainage plan prepared by a <br /> licensed civil engineer depicting all final grades and on-site drainage control measures <br /> to protect all cut and fill slopes from surface water overflow. This plan shall be <br /> subject to the review and approval of the City Engineer and/or the Director of <br /> Building Inspection prior to the issuance of any building permits. <br /> <br />43. The applicant shall grant an easement to the City over those parcels needed for public <br /> service easements (P.S.E.) and which are approved by the City Engineer or other <br /> easements which may be designated by the City Engineer. <br /> <br />44. A maintenance agreement for all the private shared improvements shall be submitted <br /> to the City Attorney for review and approval prior to recordation of the parcel map. <br /> <br />45. All existing wells on the site shall be removed or sealed, filled and abandoned <br /> pursuant to Alameda County Ord. 73-68, prior to the start of grading operations <br /> unless Zone 7 retains specific wells for observation wells, or special approval is <br /> obtained from the City Engineer for temporary use of an existing well for construction <br /> water or for irrigation purposes. Any wells designated for abandonment or any wells, <br /> encountered during construction, are to be destroyed in accordance with a permit <br /> <br />6 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.