Laserfiche WebLink
amendments to the IZO would be to specify a specific mix of unit sizes (by number of <br /> bedrooms) and affordability levels. <br /> In the interest of establishing the bedroom mix and affordability requirements with the <br /> Housing Element adoption, the draft ODS for the Housing Sites3 includes a bedroom <br /> mix and affordability requirements for the IZO units. <br /> Bedroom Mix for IZO units: <br /> • Minimum of 10-percent of IZO units to be three-bedroom; <br /> • 45-percent of IZO units to be two-bedroom; and <br /> • The remainder of the IZO units to be one-bedroom or studio, except that no more <br /> than 10-percent of IZO units may be studios. <br /> This bedroom mix for IZO units will help to secure more IZO units suitable for larger <br /> households and families (typically the most difficult to secure), while still leaving close to <br /> half of the IZO units as smaller one-bedroom and studio IZO units for smaller <br /> households. <br /> Under the IZO, new multi-family projects must provide at least 15-percent of the <br /> project's dwelling units at levels affordable to very low- and low-income households. Of <br /> that 15-percent or more IZO units, affordability levels are proposed to be attributed in a <br /> specific mix. <br /> Affordability Mix for Rental IZO Units: <br /> • A minimum of 25-percent of IZO units at no more than 50-percent AMI (Very <br /> Low-Income Units); <br /> • A minimum of 25-percent of IZO units at no more than 60-percent AMI <br /> (Low-Income Units); and <br /> • No more than 50-percent of IZO units at no more than 80-percent AMI (reflecting <br /> the low end of the Moderate-Income range (80-120-percent AMI). <br /> For ownership IZO units, staff recommends IZO unit prices be set at no more than <br /> 120-percent AMI, which is a Moderate-Income range within which most households will <br /> be able to qualify for a first mortgage. <br /> Staff believes this mix would secure more units in the hardest to reach very low-income <br /> categories, as well as allowing for a balance that will be economically viable for <br /> developers and allow for a proportion of units to meet moderate income "workforce" and <br /> middle-income housing goals. However, updating the IZO there will provide an <br /> 3 The ODS for R-M, C-C, and M-U Districts do not include this same requirement. Projects in these <br /> districts would need to meet the requirements of the IZO, but the unit size and affordability levels would <br /> be on a project-by-project basis. This is because many of the projects anticipated in these zoning districts <br /> would not be subject to the IZO (i.e., the IZO applies to new multifamily residential projects of 15 units or <br /> more, where at least 15 percent of the project's dwelling units shall be affordable to very low, and/or low <br /> income households). If the IZO were to apply, the bedroom-mix and affordability levels would need to be <br /> custom-tailored to account for the lack of"economies of scale." <br /> Page 4 of 8 <br />