Laserfiche WebLink
Project cost: $272,217 <br /> Source of funding: Water Connection Fees (25%) and Water Replacement <br /> Fund (75%) <br /> % funded by development impact fees: 25% <br /> • Water Quality Improvements at Lower Zone Storage Tanks — Project #20156 <br /> Description: The City's water system currently experiences some areas of <br /> nitrification. Staff has utilized short term operating practices to address this <br /> issue, but a more reliable long-term solution is required. The primary area of <br /> nitrification occurs in the lower zone around the Foothill Tank service area. <br /> This project will pilot the use of a chemical residual boosting and mixing <br /> system at the Foothill Tank to mitigate nitrification. If successful, this system <br /> will be implemented permanently at the Foothill Tank and potentially other <br /> locations. <br /> Approximate project completion date: 2023 <br /> Project cost: $1,921,732 <br /> Source of funding: Water Connection Fees (14%) and Water Replacement <br /> Fund (86%) <br /> % funded by development impact fees: 14% <br /> Sewer Expansion Fund (432) <br /> • Sewer Capacity Evaluation — Project #16245 <br /> Description: This project is a general capacity study of the City's sewer <br /> collection system to confirm proper sizing of sewer piping, pump stations and <br /> other facilities. The findings will be integrated into the Sewer System <br /> Management Plan, and include focused evaluations for East Amador Trunk <br /> Sewer, East Amador Relief Sewer, East Pleasanton Specific Plan, Ruby Hill, <br /> and Commerce Circle service areas. Integration with the Vineyard service <br /> area evaluation will be included. This project will create a hydraulic model of <br /> the sewer system which will be updated to reflect changes and evaluate <br /> adequacy of proposed changes to the system. <br /> Approximate project completion date: 2023 <br /> Project cost: $700,000 <br /> Source of funding: Sewer Connection Fees (25%); Sewer Replacement Fund <br /> (75%) <br /> % funded by development impact fees: 25% <br /> • Del Valle Parkway/Nevada Street Sewer Additions — Project #90228 <br /> Description: Installation of a 16" sewer main line from Stanley Blvd to Bernal <br /> Avenue. <br /> Approximate project completion date: 2025 <br /> Project cost: $1,222,700 <br /> Source of funding: Sewer Connection Fees (57%) and Sewer Replacement <br /> Fund (43%) <br /> % funded by development impact fees: 57% <br /> Page 7 of 8. <br />