My WebLink
|
Help
|
About
|
Sign Out
10
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
122022
>
10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2022 4:20:57 PM
Creation date
12/15/2022 4:20:49 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/20/2022
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Johnson Drive Economic Development Zone — Project #18531 <br /> Description: This project design and construct the transportation <br /> improvements associated with the Johnson Drive Economic Development <br /> Zone: Traffic Signals on Johnson (Commerce Drive and Owens Drive <br /> North); Stoneridge and Johnson left turns; Stoneridge Drive and 680 <br /> northbound on ramp widening; and Johnson Drive widening. <br /> Approximate project completion date: 2023 <br /> Project cost: $6,385,865 <br /> Source of funding: Traffic Impact Fee <br /> % funded by development impact fees: 100% <br /> Tri-Valley Transportation Fund (214) <br /> Amount collected in previous fiscal years subject to 5-year limitation: $1,559,421 <br /> Funds are committed to the following project: <br /> • Tri-Valley Transportation Development Fee Reserve — Project #01541 <br /> Description: This project establishes a reserve fund for various regional <br /> projects to help mitigate traffic congestion in the Tri-Valley area. These <br /> funds represent a portion of the costs and are the City's 20 percent set- <br /> aside portion of the Tri-Valley Transportation Development Fees (TVTDF) <br /> collected in the city of Pleasanton. The Tri-Valley projects include: 1-580/1- <br /> 680 flyover and hook ramps, State Route 84/1-580 corridor improvements <br /> from 1-580 to 1-680, Isabel Route 84/1-680 Interchange, 1-680 auxiliary <br /> lanes between Bollinger Canyon Road and Diablo Road, West Dublin- <br /> Pleasanton BART Station, 1-580 HOV lanes from Tassajara Road to <br /> Vasco Road, 1-680 HOV lanes from State Route 84 to the top of Sunol <br /> Grade, 1-680/Alcosta Boulevard Interchange Modifications, Crow Canyon <br /> Road Safety Improvements, Vasco Road Safety Improvements, and <br /> Express Bus Service. In addition to these projects, the TVTC has <br /> approved 11 additional projects among which is the EI Charro Road <br /> extension in Pleasanton. <br /> Approximate project completion date: On-Going <br /> Project cost: $1,852,517 <br /> Source of funding: Tri-Valley Transportation Development Fee <br /> % funded by development impact fees: 100% <br /> Downtown Parking-In-Lieu Fund (104) <br /> Amount collected in previous fiscal years subject to 5-year limitation: $582,460 <br /> Funds are committed to the following project: <br /> • Expand Parking on Downtown Transportation Corridor — Project #17448 <br /> Description: A public parking lot on the transportation corridor between <br /> Bernal Avenue and Abbie Street. The project replaces an existing <br /> stabilized gravel parking lot that has a one-way drive isle and diagonal <br /> parking. The new parking lot will be similar to the Firehouse Arts Center <br /> parking lot with a two-way drive isle, 90-degree parking on each side, walk <br /> path and landscaping. The project requires a 5-to-6-foot retaining wall <br /> Page v of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.