Laserfiche WebLink
ZONE 7 <br /> ALAMEDA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT <br /> BOARD OF DIRECTORS <br /> RESOLUTION NO. <br /> INTRODUCED BY <br /> SECONDED BY <br /> SCENARIO 4B — 5.5% <br /> Adoption of the Treated Water Service Rates for <br /> Calendar Years 2023, 2024, 2025, and 2026 <br /> WHEREAS the Agency engaged an independent water rate consultant, Raftelis, to <br /> prepare a Treated Water Rates Study to identify the cost of providing wholesale treated water <br /> service and to recommend treated water rates for Calendar Years (CY) 2023, 2024, 2025, and <br /> 2026. <br /> WHEREAS the study recommends increasing fixed charge revenue recovery from 42.5% <br /> in CY 2022 to 45% by CY 2023. <br /> WHEREAS, in FY 2022-23, additional funding of $2,900,000 for the Stoneridge Well <br /> PFAS Facility project is required. <br /> NOW, THEREFORE BE IT RESOLVED by the Board of Directors of Zone 7 of the <br /> Alameda County Flood Control and Water Conservation District to adopt the following treated <br /> water rate schedules for Calendar Years 2023, 2024, 2025, and 2026. <br /> FIRST, a volume-based water delivery charge, per the table below for all metered water <br /> delivered to each customer per month per 100 cubic feet (CCF) for CY 2023, CY 2024, CY <br /> 2025, and CY 2026. <br /> Calendar Year 2023 2024 2025 2026 <br /> Volume-based Rate per CCF $2.27 $2.34 $2.44 $2.47 <br /> SECOND, increasing fixed charge revenue recovery from 42.5% in CY 2022 to 45% by <br /> CY 2023. <br /> Calendar Year 2023 2024 2025 2026 <br /> Fixed Revenue Recovery 45% 45% 45% 45% <br /> THIRD, a fixed charge of $27,131,280 for Retailers and $264,160 for Direct Customers <br /> for CY 2023 per the tables below. Actual Fixed Charge monthly billing will be 1/12 of the <br /> annual amount. <br />