My WebLink
|
Help
|
About
|
Sign Out
18
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
120622
>
18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 4:07:25 PM
Creation date
11/30/2022 4:07:15 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/6/2022
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ZONE 7 <br /> ALAMEDA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT <br /> BOARD OF DIRECTORS <br /> RESOLUTION NO. <br /> INTRODUCED BY <br /> SECONDED BY <br /> SCENARIO 4 — 5% <br /> Adoption of the Treated Water Service Rates for <br /> Calendar Years 2023, 2024, 2025, and 2026 <br /> WHEREAS the Agency engaged an independent water rate consultant, Raftelis, to <br /> prepare a Treated Water Rates Study to identify the cost of providing wholesale treated water <br /> service and to recommend treated water rates for Calendar Years (CY) 2023, 2024, 2025, and <br /> 2026. <br /> WHEREAS the study recommends increasing fixed charge revenue recovery from 42.5% <br /> in CY 2022 to 45% by CY 2023. <br /> WHEREAS, in FY 2022-23, additional funding of $2,600,000 for the Stoneridge Well <br /> PFAS Facility project is required from the Reserve for Economic Uncertainties (Fund 100 — <br /> Water Enterprise Operations). <br /> NOW, THEREFORE BE IT RESOLVED by the Board of Directors of Zone 7 of the <br /> Alameda County Flood Control and Water Conservation District to adopt the following treated <br /> water rate schedules for Calendar Years 2023, 2024, 2025, and 2026. <br /> FIRST, a volume-based water delivery charge, per the table below for all metered water <br /> delivered to each customer per month per 100 cubic feet (CCF) for CY 2023, CY 2024, CY <br /> 2025, and CY 2026. <br /> Calendar Year 2023 2024 2025 2026 <br /> Volume-based Rate per CCF $2.26 $2.32 $2.40 $2.42 <br /> SECOND, increasing fixed charge revenue recovery from 42.5% in CY 2022 to 45% by <br /> CY 2023. <br /> Calendar Year 2023 2024 2025 2026 <br /> Fixed Revenue Recovery 45% 45% 45% 45% <br />
The URL can be used to link to this page
Your browser does not support the video tag.