My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
120622
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 12:09:29 PM
Creation date
11/30/2022 12:09:27 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/6/2022
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 2 <br /> Contingency and Allowance Summary <br /> Available Contingency/Allowance Funding <br /> Project Contingency $ 337,000 <br /> Bid Item Allowances <br /> Plywood Sheathing Bid Item#2 $ 20,000 <br /> Curb Repairs Bid Item#3 $ 15,000 <br /> Wood Repairs Bid Item#4 $ 40,000 <br /> Rafter Repairs Bid Item#5 $ 20,000 <br /> Total Bid Item Allowances $ 95,000 <br /> Total Funding $ 432,000 <br /> Contract Changes To Date <br /> Structural Repairs to Roof Decking $ 71,004 <br /> Additional Stucco Removal and Installation $ 57,801 <br /> Address Concentrated Roof Water $ 49,321 <br /> Window System Change for Seismic Bracing $ 31,746 <br /> Plywood Replacement at Eaves $ 44,071 <br /> Miscellaneous Wood Repairs $ 46,553 <br /> Various Miscellaneous Changes $ 27,106 <br /> Total Contract Changes To Date $ 327,602 <br /> Anticipated Contract Changes <br /> Gable End Window Replacements $ 251,783 <br /> HVAC Relocation for Maintenance Access $ 22,615 <br /> Remobilization and Weather Protection $ 20,000 <br /> Total Anticipated Contract Changes $ 294,398 <br /> Contingency for Remaining Work $ 85,000 <br /> Total Anticipated Expenditures $ 707,000 <br /> Contingency Shortfall $ (275,000) <br />
The URL can be used to link to this page
Your browser does not support the video tag.