Laserfiche WebLink
ATTACHMENT 2 <br /> Contingency and Allowance Summary <br /> Available Contingency/Allowance Funding <br /> Project Contingency $ 337,000 <br /> Bid Item Allowances <br /> Plywood Sheathing Bid Item#2 $ 20,000 <br /> Curb Repairs Bid Item#3 $ 15,000 <br /> Wood Repairs Bid Item#4 $ 40,000 <br /> Rafter Repairs Bid Item#5 $ 20,000 <br /> Total Bid Item Allowances $ 95,000 <br /> Total Funding $ 432,000 <br /> Contract Changes To Date <br /> Structural Repairs to Roof Decking $ 71,004 <br /> Additional Stucco Removal and Installation $ 57,801 <br /> Address Concentrated Roof Water $ 49,321 <br /> Window System Change for Seismic Bracing $ 31,746 <br /> Plywood Replacement at Eaves $ 44,071 <br /> Miscellaneous Wood Repairs $ 46,553 <br /> Various Miscellaneous Changes $ 27,106 <br /> Total Contract Changes To Date $ 327,602 <br /> Anticipated Contract Changes <br /> Gable End Window Replacements $ 251,783 <br /> HVAC Relocation for Maintenance Access $ 22,615 <br /> Remobilization and Weather Protection $ 20,000 <br /> Total Anticipated Contract Changes $ 294,398 <br /> Contingency for Remaining Work $ 85,000 <br /> Total Anticipated Expenditures $ 707,000 <br /> Contingency Shortfall $ (275,000) <br />