Laserfiche WebLink
Ordinance No. 2241 <br /> Page 10 of 60 <br /> 9. Lath and/or wallboard Inspection. Lath and gypsum board inspections shall be made after lathing <br /> and gypsum board, interior and exterior, is in place, but before any plastering is applied or gypsum <br /> board joints and fasteners are taped and finished. <br /> EXCEPTION: Gypsum board that is not part of a fire-resistance-rated assembly. <br /> 10. Fire-resistance-rated Construction Inspection. Wherever fire-resistance-rated construction is <br /> required,the Building and Safety Official shall require an inspection of such construction after all <br /> lathing and/or wallboard is in place,but before any plaster is applied, or before wallboard joints and <br /> fasteners are taped and finished. Protection of joints and penetrations in fire-resistance-rated <br /> assemblies, smoke barriers and smoke partitions shall not be concealed from view until inspected <br /> and approved. <br /> 11. Weather-exposed balcony and walking surface waterproofing. Where balconies or other elevated <br /> walking surfaces are exposed to water from direct or blowing rain, snow or irrigation, and the <br /> structural framing is protected by an impervious moisture barrier, all elements of the impervious <br /> moisture barrier system shall not be concealed until inspected and approved. <br /> EXCEPTION: Where special inspections are provided in accordance with California Building <br /> Code Section 1705.1.1, Item 3. <br /> 12. Other Inspections. In addition to the inspections specified above,the Building and Safety Official is <br /> authorized to make or require other inspections of any construction work to ascertain compliance <br /> with the provisions of this code and other laws that are enforced by the department of building <br /> safety. <br /> 13. Final Inspection. Final inspection shall be made after the permitted work is complete and prior to <br /> occupancy. <br /> I <br />