My WebLink
|
Help
|
About
|
Sign Out
16
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
111522
>
16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 12:33:18 PM
Creation date
11/9/2022 12:32:41 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/15/2022
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Each of these actions support the reduction in Vehicle Miles Traveled and the reduction <br /> of greenhouse gases. <br /> SUMMARY AND CONCLUSION <br /> The West Las Positas Corridor Improvement Project is a high priority project for the City <br /> Council, listed in both the 2019 and 2021 City Council priority lists as a "Priority A" <br /> project. <br /> The BPTC served as the steering committee for the project and supports the plan. The <br /> plan creates a design that meets the 2018 Pedestrian and Bicycle Master Plan's goal of <br /> creating a continuous facility that is usable by all ages and abilities. West Las Positas <br /> Boulevard is a primary route to school for four different schools and used by hundreds <br /> of students every day, and which sees a high level of pedestrian and bicycle use, while <br /> at the same time experiencing some of the highest collision volumes in the city for <br /> pedestrians and cyclists. The proposed Phase 1 improvements, and implementation of <br /> the Bicycle and Pedestrian Corridor Plan as a whole, is an opportunity to provide much- <br /> needed complete, high-quality pedestrian and bicycle facilities along a key arterial <br /> street. <br /> u. itt:. .' : Fiscal Review: Approved by: <br /> 4 <br /> Ellen Clark —J Susan Hsieh Gerry Beaudin <br /> Director of Director of Finance City Manager <br /> Community Development <br /> Attachments: <br /> 1 . Phase 1 Design <br /> 2. WLP Bicycle and Pedestrian Corridor Preferred Alternative <br /> Page 14 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.