Laserfiche WebLink
PUD-145 Planning Commission <br />Page 3 of 17 <br />13. WINDOWS: Manufacturer type, design, material, and installation details for all windows within the <br />project shall be specified for each unit/building in conformance with the Approved Plans in the <br />building permit submittal. Any proposed modifications shall be subject to review and approval by <br />the Planning Division prior to issuance of building permits. <br /> <br />14. FENCE/WALL: All fencing and walls shall be shown on the construction plans with the building <br />permit submittal. The design and location must be approved by the Planning Division and comply <br />with all setback requirements. <br /> <br />15. LIGHTING PLAN: The applicant shall submit a lighting plan with the building permit submittal. <br />The plan shall include photometric contours, manufacturer’s specifications on the fixtures, and <br />mounting heights. All exterior lighting including landscape lighting shall be directed downward and <br />designed or shielded so as to not shine onto neighboring properties or streets. The photometrics <br />shall be reviewed and approved by the City Traffic Engineer and Director of Community <br />Development prior to building permit issuance. The type and location of all exterior light fixtures <br />shall be reviewed and approved by the Director of Community Development prior to building <br />permit issuance. <br /> <br />16. BUILDING SURVEY: The applicant shall submit a building survey and/or record of survey and a <br />site development plan in accordance with the provisions of Chapter 18.68 of the PMC. These <br />plans shall be approved by the Chief Building Official prior to building permit issuance. The site <br />development plan shall include all required information to design and construct site, grading, <br />paving, drainage, and utilities. <br /> <br />17. PAD AND SETBACK CERTIFICATION: The applicant shall submit a pad elevation certification <br />prepared by a California licensed land surveyor or registered civil engineer to the Chief Building <br />Official and Director of Community Development certifying the pad elevations and building <br />locations (setbacks) are conforming to the approved plans, prior to receiving a foundation <br />inspection for the structures. <br /> <br />18. BUILDING HEIGHT CERTIFICATION: The applicant shall submit a building height certification <br />prepared by a California licensed land surveyor or civil engineer to the Director of Community <br />Development before the first framing or structural inspection by the Building and Safety Division. <br />The height of the structures shall be surveyed and verified as being in conformance to the <br />approved building heights as shown on Exhibit B or as otherwise conditioned. <br /> <br />19. FINAL INSPECTION: Final inspection by the Planning Division is required prior to occupancy. <br /> <br />20. FIREPLACES AND FIRE PITS: Fireplaces and fire pits shall be gas fireplaces, pellet fueled wood <br />heaters, or EPA certified wood-burning appliances. The fireplace types shall be indicated on the <br />plan and/or specification sheet(s) submitted to for issuance of building permits. <br /> <br />Green Building and Sustainability Measures <br /> <br />21. PHOTOVOLTAIC AND SOLAR WATER HEATING SYSTEMS: The new residence shall be <br />constructed to allow for future installation of a photovoltaic (PV) system and a solar water heating <br />system. The measures shall be shown on the building permit plans for review and approval by the <br />Director of Community Development prior to building permit issuance. The applicant shall provide <br />the future owners the necessary information delineating the means by which photovoltaic panels <br />can be applied to the roof of the new structure covered by this approval. This information shall be <br />reviewed and approved by the Director of Community Development prior to occupancy of the unit. <br />The applicant shall comply with the following requirements for making the new dwelling unit on <br />the subject site photovoltaic-ready and solar water heating-ready: