Laserfiche WebLink
Arborist Report. May 8, 2021. HortScience, Inc. <br />535 Sycamore Road. Davasam and Chekka. Page 12 <br /> <br /> <br />5. Prior to grading, pad preparation, excavation for foundations/footings/walls, <br />trenching, trees may require root pruning outside the TREE PROTECTION ZONE by <br />cutting all roots cleanly to the depth of the excavation. Roots shall be cut by <br />manually digging a trench and cutting exposed roots with a sharp saw or other <br />approved root pruning equipment. The Consulting Arborist will identify where <br />root pruning is required. <br /> <br />6. All underground utilities, drain lines or irrigation lines shall be routed outside the <br />TREE PROTECTION ZONE. If lines must traverse through the protection area, they <br />shall be tunneled or bored under the tree as directed by the Consulting Arborist. <br /> <br />7. No materials, equipment, spoil, waste or wash-out water may be deposited, <br />stored, or parked within the TREE PROTECTION ZONE (fenced area). <br /> <br />8. Any additional tree pruning needed for clearance during construction must be <br />performed by a Certified Arborist and not by construction personnel. <br /> HortScience, Inc. <br /> James R. Clark, Ph.D. <br />Certified Arborist WE-0846 <br /> <br />