My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
110122
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2022 3:38:18 PM
Creation date
10/26/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/1/2022
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No. 2241 <br /> Page 9 of 60 <br /> Reinforcing steel or structural framework of any part of a building or structure or any plumbing, <br /> mechanical or electrical components shall not be covered or concealed without first obtaining the <br /> approval of the Building and Safety Official. Protection of joints and penetrations in fire-resistive <br /> assemblies shall not be concealed from view until inspected and approved. <br /> The Building and Safety Official shall require notification from the permit holder in order to make the <br /> following inspections: <br /> 1. Foundation Inspection. Footing and foundation inspections shall be made after excavations for <br /> footings are complete and any required reinforcing steel is in place. Plumbing,mechanical or <br /> electrical components are required to be in place. For concrete foundations,required forms shall be <br /> in place prior to inspection. The foundation inspection shall include excavations for thickened slabs <br /> intended for the support of bearing walls, partitions, structural supports, or equipment. Materials <br /> for the foundation shall be on the job,except where concrete is ready mixed in accordance with <br /> ASTM C 94,the concrete need not be on the job. <br /> 2. Under-slab and Under-floor Inspection. Concrete slab and under-floor inspections shall be made <br /> after in-slab or under-floor reinforcing steel and building service equipment,conduit,wiring, <br /> ducting,piping accessories or other ancillary equipment items are in place,but before any concrete <br /> is placed,or insulation and/or floor sheathing is installed, including the subfloor. <br /> 3. Floodplain Inspection, in designated flood hazard areas. Upon placement of the lowest floor and <br /> prior to further vertical construction,a registered design professional shall prepare and submit <br /> documentation to the Building and Safety Official of the elevation of the lowest floor, including <br /> basement, as required in Section 1612.4 of the California Building Code,or for one-and two-family <br /> dwellings, Section R322 of the California Residential Code. <br /> 4. Shear and Roof Inspection. A lateral bracing,roof framing and sheathing inspection shall be made <br /> before any weather protection covering or roofing material is installed on the walls or roof of any <br /> building. <br /> 5. Plumbing,Mechanical, Gas and Electrical Inspection. Rough inspection of plumbing,mechanical, <br /> gas and electrical systems shall be made prior to covering or concealment,before fixtures or <br /> appliances are set or installed,and prior to framing inspection. <br /> 6. Frame Inspection. Framing inspections shall be made after the roof deck or sheathing are approved <br /> and the structure is adequately protected from weather intrusion,all framing, fire-blocking and <br /> bracing are in place, all pipes,chimneys and vents to be concealed are complete and the rough <br /> electrical, plumbing,heating,wiring,piping and ducts are approved.Moisture content of framing <br /> members shall be verified in accordance with the California Green Building Standards Code. <br /> 7. Sprinkler System Pre-Concealment Inspection. Fire sprinklers shall be installed in all required <br /> locations,and the sprinkler piping installation shall be tested and inspected prior to the concealment <br /> of any sprinkler system piping. <br /> 8. Energy Efficiency Inspections. Inspections shall be made to determine compliance with the <br /> California Energy Code, Title 24, Part 6 and shall include, but not be limited to, inspections for: <br /> envelope insulation R-and U-values,fenestration U-value,duct system R-value,and HVAC and <br /> water-heating equipment efficiency. Wall and concealed ceiling insulation inspections are required <br /> to be made after the frame inspection is approved and before being covered. <br />
The URL can be used to link to this page
Your browser does not support the video tag.