My WebLink
|
Help
|
About
|
Sign Out
CC MIN 03152022
City of Pleasanton
>
CITY CLERK
>
MINUTES
>
2020 - PRESENT
>
2022
>
CC MIN 03152022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2022 11:44:05 AM
Creation date
9/21/2022 11:43:55 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
3/15/2022
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
requested retaining at least a small seating area for the benefit of parents. She commended the shade <br /> trees and drinking fountains. She requested sensitivity towards neighbors with the lighting. <br /> Councilmember Balch reported he was a part of the 2014 Parks and Recreation Commission Master <br /> Plan Task Force so he recognizes this is a need not yet met, but noted some of the other needs <br /> identified in 2014 were easier to pick off of the list. He commended the design and process. He stated it <br /> is a high cost and it will have to be weighed against other needs like water quality and transportation. <br /> He advised the pandemic showed how essential the community parks are. He stated he will support the <br /> motion. He requested looking into a two-phase construction for elements such as the restroom and <br /> shade structures and also having a value engineering study. He advised corporations are still <br /> challenged by the pandemic and cautioned against expectation of sponsorship dollars being available. <br /> In response to Councilmember Balch, Interim City Manager Dolan stated the best way to identify the <br /> potential cost of construction is to get bids. City Engineer Steve Kirkpatrick advised he has heard the <br /> City Council intends to take the design to biddable construction documents with a look into the <br /> possibility of phasing and value engineering in the meantime. He confirmed this will give the City a <br /> better idea of what to expect for cost in its Capital Improvement Plan budget. <br /> Councilmember Narum commended the design but has concerns about cost. She requested <br /> preparation of bid documents with several add-on options such as a restroom, seating areas, and <br /> shade structures outside of the skating area itself. She advised this may help with obtaining a favorable <br /> cost by creating a second phase. She noted attracting visitors to the City helps to fund the next project <br /> through local expenditures on things like food and gasoline. <br /> Mayor Brown thanked the local skating community for its support of the item and for helping the City <br /> Council appreciate the high-interest level. She stated how rare it is for a Parks and Recreation project <br /> to convert existing space and not have a single negative comment. She commended how all wheels will <br /> be able to use the skatepark. She expressed she is eager to get moving. She advised the skatepark will <br /> also reduce water usage needs. She recognized the entire Lambert family for its skatepark advocacy. <br /> MOTION: It was m/s by Testa/Arkin to approve the completion of the design phase through <br /> biddable construction documents and with the possibility of a phase plan approach as <br /> recommended and as noted. Motion passed by the following vote: <br /> Ayes: Councilmembers Arkin, Balch, Narum, Testa, Mayor Brown <br /> Noes: None <br /> Absent: None <br /> At 9:00 p.m., Mayor Brown recessed the meeting. The meeting resumed at 9:08 p.m. <br /> 21. Provide direction on housing policy topics including the Inclusionary Zoning Ordinance, Lower- <br /> Income Housing Fund, Workforce Housing, Affordability by Design and other City housing <br /> programs, as part of the 2023- 2031 (6th Cycle) Housing Element Update <br /> Community Development Ellen Clark reported staff is seeking policy direction on several large and <br /> complicated topics for potential inclusion in the Housing Element update for the sixth cycle. <br /> Senior Planner Shweta Bonn reported the eight-year Housing Element is a State mandate to ensure <br /> the City is adequately zoned to meet its sixth cycle Regional Housing Needs Allocation (RHNA) totals. <br /> She provided an update on where the City is in its process, including direction from the City Council to <br /> hold this discussion about how or if the City should include the Lower-Income Housing Fund (UHF), <br /> Inclusionary Zoning Ordinance (IZO), Housing Density Bonus Program, workforce housing, and the <br /> concept of affordability by design. <br /> City Council Minutes Page 8 of 22 March 15, 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.