My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
092022
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2022 3:34:57 PM
Creation date
9/14/2022 3:34:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/20/2022
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> ValleyPrecision Grading, <br /> Inc, <br /> Athletic Construction Specialist <br /> TENCATE GRASS i Greenfields IRorvTu F <br /> 08.22.2022 <br /> Attn:Giacomo Damonte <br /> Parks Maintenance Superintendent,Operations Services Department <br /> City of Pleasanton I P.O.Box 520,Pleasanton,CA 94566 <br /> RE: Bernal Park Infill Top-Off <br /> Please find scope of work to supply and install one of the selected infill options listed below.The estimate is based upon 325,000 <br /> total square feet marked with one soccer field per field. <br /> Synthetic Turf Scope of Work: <br /> 1. Supply and install one of the selected infill options listed below. <br /> 2. Broom fields and level infill for uniform surface depth. <br /> 3. Supply all equipment <br /> 4. Provide any repairs needed on the field at no cost. <br /> Cost to install materials over all three(3)fields; <br /> 1. ZeoFill Infill at rate of llbs per square foot $147,331.00 <br /> (Zeofill from KMI is the original infill installed in the fields. The source is specific to a location in Death Valley,CA. The <br /> sourcing of material supplied by VPG has not changed since installation and last top off performed.) <br /> Exclusions: <br /> • Any work,materials or labor not directly included and/or state above. <br /> • Any mass grading of the site or soil removal from the site. And related demolition. <br /> • Provide any additional base rock outside of the 6"section stated in scope of work. <br /> • Any concrete work. <br /> • Any underground work. <br /> • Any field graphics or logos not listed on bid plans and/or documents. <br /> • Any sports event,goals,sports netting,or any other athletic equipment installation or <br /> Applications other than specified above. <br /> • SWPPP measures of any kind <br /> • Any supply,install or adjustment of utility boxes for electrical or irrigation. <br /> • Electrical,scoreboard and communication lines not provided. <br /> • Additional mobilizations$4,500.00. <br /> • ANYTHING NOT INCLUDED IN ABOVE SCOPE <br /> Thank you again for this opportunity! We certainly do look forward to working with you and are available at any time to answer any <br /> questions or review this proposal. <br /> Sincerely, <br /> Kristopher Olsen <br /> VPG,INC <br /> 3330 Luyung Drive Rancho Cordova,CA 95742 *Office 916.638.8800*Fax 916.638.8808 <br /> General Engineering Contractor* CSLB#783244 * DIR#1000002356 <br />
The URL can be used to link to this page
Your browser does not support the video tag.