Laserfiche WebLink
EXHIBIT A <br />Civic Center— Recreation Modular <br />$323.04 <br />$45.23 <br />$1,337.38 <br />Fire Station #2 <br />$611.75 <br />$85.64 <br />$2,532.64 <br />Fire Training Tower <br />$317.50 <br />$44.45 <br />$1,314.44 <br />Nature House <br />$282.64 <br />$39.57 <br />$1,170.14 <br />Sewer Pump Station #7 <br />$650.96 <br />$2,603.84 <br />Sewer Pump Station #8 <br />$650.96 <br />$2,603.84 <br />Sports Park — RW Booster Station <br />$209.36 <br />$29.31 <br />$866.75 <br />Valley Volunteer Building <br />$325.66 <br />$45.59 <br />$1,348.21 <br />Tp <br />$63,725.57 <br />For Emergency Repair/Non-Scheduled only: Percent of mark-up on material: 20% Percent Mark- <br />up on invoicing must be demonstrated as a percentage. Example: Material $1,000 + 20% ($200) _ <br />$1,200. <br />Truck Stock will be calculated at 7% of the total of material cost. <br />Consumables — 9% <br />