My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
090622
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2022 2:01:16 PM
Creation date
8/31/2022 2:01:03 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/6/2022
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D.H.R. CONSTRUCTION, INC. <br />860 Green Island Road, American Canyon, CA 94503 <br />Tel: (707) 552-6500 • Fax: (707) 552-6555 • www.dhrgolf.com <br />DETAILED COST BREAKDOWN DATE 8/16/2022 <br />Project: Callippe Preserve Golf Course, Pleasanton, CA <br />Greenside Bunker Renovation Holes 4,6,7 & 17 <br />Greenside Bunker Renovation Holes 4,6,7 & 17 <br />Item No. <br />Description of Item <br />Estimated <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 Mobilization <br />1 <br />LS <br />$ <br />2,500.00 <br />$ <br />2,500.00 <br />2 Removal of Bunker Sand, Gravel & Drain Pipe <br />Hole #4 Greenside bunker <br />4150 <br />SF <br />$ <br />2.30 <br />$ <br />9,545.00 <br />Hole #6 Greenside bunker back <br />3180 <br />SF <br />$ <br />2.30 <br />$ <br />7,314.00 <br />Hole #6 Greenside bunker front <br />1255 <br />SF <br />$ <br />2.30 <br />$ <br />2,886.50 <br />Hole #7 Greenside bunker left <br />1460 <br />SF <br />$ <br />2.30 <br />$ <br />3,358.00 <br />Hole #7 Greenside bunker right <br />1655 <br />SF <br />$ <br />2.30 <br />$ <br />3,806.50 <br />Hole #17 Greenside bunker <br />3200 <br />SF <br />$ <br />2.30 <br />$ <br />7,360.00 <br />3 Turf Removal and Disposal Off-site <br />14000 <br />SF <br />$ <br />0.75 <br />$ <br />10,500.00 <br />Up to 8' ft. around perimeter <br />4 Better Billy Bunker Construction <br />Inc. new drain pipe, gravel, polymer, sand <br />Clean & re-establish firm edge <br />Hole #4 Greenside bunker <br />4150 <br />SF <br />$ <br />10.95 <br />$ <br />45,442.50 <br />Hole #6 Greenside bunker back <br />3180 <br />SF <br />$ <br />10.95 <br />$ <br />34,821.00 <br />Hole #6 Greenside bunker front <br />12551 <br />SF <br />$ <br />10.95 <br />$ <br />13,742.25 <br />Hole #7 Greenside bunker left <br />1460 <br />SF <br />$ <br />10.95 <br />$ <br />15,987.00 <br />Hole #7 Greenside bunker right <br />1655 <br />SF <br />$ <br />10.95 <br />$ <br />18,122.25 <br />Hole #17 Greenside bunker <br />3200 <br />$ <br />10.95 <br />$ <br />35,040.00 <br />5 AquaSmart Pro Polymer Coated Sand <br />14000 <br />SF <br />$ <br />0.20 <br />$ <br />2,800.00 <br />Tilled 3" Deep @ rate of 80 lbs / 1000 SF <br />6 Irrigation Sub -Surface Drip System <br />7 <br />EA <br />$ 3,800.00 <br />$ <br />26,600.00 <br />1000' Kits - Allow 1 per Bunker <br />7 Amendments, Fertilizers & Seedbed Prep. <br />14000 <br />SF <br />$ <br />0.30 I <br />$ <br />4,200.00 <br />Owner Purchased & Delivered to project <br />Contractor to Apply & Incorporate into Soil <br />8 Sod - Purchase, Delivery & Installation <br />14000 <br />SF <br />$ <br />1.20 <br />$ <br />16,800.00 <br />TOTAL <br />$ 260,825.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.