My WebLink
|
Help
|
About
|
Sign Out
17
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
081622
>
17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2022 9:30:09 AM
Creation date
8/19/2022 9:29:23 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/16/2022
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Final Redevelopment Framework Concept: <br /> Based on input received from the various meetings and comments received on the Draft Framework <br /> options,the team will develop a final development structure concept.This concept will include: <br /> • Land use/massing concept:VMWP will lead the land use/massing concept with land use <br /> designations including number of units,square footage of nonresidential uses,employment <br /> generating land uses, and mixed uses. These will be expanded to illustrate building types and <br /> massing and integrate the illustrations of placemaking and other images. <br /> • Transportation/Infrastructure Concept: internal roadway networks,connections to existing <br /> roadways,the relationship to transit and the transit center, bicycle/pedestrian infrastructure, <br /> stormwater/green infrastructure (VMWP to support),any additional sewer/water infrastructure <br /> needed to support the concept. <br /> • Public realm/placemaking concept:VMWP will lead the development of an architectural <br /> standards/design guidelines playbook;open spaces/community gathering spaces;on-site locations <br /> for place-making. <br /> • VMWP will attend a three-hour virtual internal team charrette to develop the Final <br /> Redevelopment/Framework Concept; and refine the land use/massing concept and public <br /> realm/placemaking concept; and develop the final concept graphic. <br /> • As appropriate,staff will take key guidance from the framework and use this to draft policies that <br /> could be integrated into the Housing Element or in another format,to ensure future development at <br /> the Mall is consistent with the Framework. <br /> Meetings: <br /> The following meetings would take place during this phase of the project: <br /> • Internal Team Charette, Refine Final Framework Concept <br /> • Property Owner Roundtable, Final Framework Concept <br /> • Community Workshop#2: Final Framework Review <br /> • Planning Commission (1)and City Council(1) Public Hearing, Review and Accept Framework <br /> 4. Phased Redevelopment Strategy: <br /> VMWP will work with the City team with stakeholder input where applicable,to develop the phased <br /> redevelopment strategy. This will include an evaluation of current zoning and what would have to be <br /> added such as new regulations and list of permitted and conditionally permitted uses,an overlay using <br /> the Mixed-Use design standards and guidelines. It will also include a series of Design principles to <br /> articulate the Framework Plan's intent. [Note, in tandem with the Framework Process,the VMWP is <br /> developing Objective Design Standards that will be applicable to existing and future High Density <br /> Housing Sites, including the Mall. These standards will be coordinated with the Framework <br /> development to ensure they are consistent and compatible with the Framework vision.] <br /> In conjunction with City staff,the Strategy will outline next steps(e.g. development of a Specific Plan or <br /> Master Plan, CEQA Analysis)and actions to be undertaken by the City and property owners to allow for <br /> entitlements to be pursued by property owners/developers. <br />
The URL can be used to link to this page
Your browser does not support the video tag.