Laserfiche WebLink
3. Final Redevelopment Framework Concept: <br /> Based on input received from the various meetings and comments received on the Draft Framework <br /> options,the team will develop a final development structure concept.This concept will include: <br /> • Land use/massing concept:VMWP will lead the land use/massing concept with land use <br /> designations including number of units,square footage of nonresidential uses,employment <br /> generating land uses, and mixed uses. These will be expanded to illustrate building types and <br /> massing and integrate the illustrations of placemaking and other images. <br /> • Transportation/Infrastructure Concept: internal roadway networks,connections to existing <br /> roadways,the relationship to transit and the transit center, bicycle/pedestrian infrastructure, <br /> stormwater/green infrastructure (VMWP to support),any additional sewer/water infrastructure <br /> needed to support the concept. <br /> • Public realm/placemaking concept:VMWP will lead the development of an architectural <br /> standards/design guidelines playbook;open spaces/community gathering spaces;on-site locations <br /> for place-making. <br /> • VMWP will attend a three-hour virtual internal team charrette to develop the Final <br /> Redevelopment/Framework Concept; and refine the land use/massing concept and public <br /> realm/placemaking concept; and develop the final concept graphic. <br /> • As appropriate,staff will take key guidance from the framework and use this to draft policies that <br /> could be integrated into the Housing Element or in another format,to ensure future development at <br /> the Mall is consistent with the Framework. <br /> Meetings: <br /> The following meetings would take place during this phase of the project: <br /> • Internal Team Charette, Refine Final Framework Concept <br /> • Property Owner Roundtable, Final Framework Concept <br /> • Community Workshop#2: Final Framework Review <br /> • Planning Commission (1)and City Council(1) Public Hearing, Review and Accept Framework <br /> 4. Phased Redevelopment Strategy: <br /> VMWP will work with the City team with stakeholder input where applicable,to develop the phased <br /> redevelopment strategy. This will include an evaluation of current zoning and what would have to be <br /> added such as new regulations and list of permitted and conditionally permitted uses,an overlay using <br /> the Mixed-Use design standards and guidelines. It will also include a series of Design principles to <br /> articulate the Framework Plan's intent. [Note, in tandem with the Framework Process,the VMWP is <br /> developing Objective Design Standards that will be applicable to existing and future High Density <br /> Housing Sites, including the Mall. These standards will be coordinated with the Framework <br /> development to ensure they are consistent and compatible with the Framework vision.] <br /> In conjunction with City staff,the Strategy will outline next steps(e.g. development of a Specific Plan or <br /> Master Plan, CEQA Analysis)and actions to be undertaken by the City and property owners to allow for <br /> entitlements to be pursued by property owners/developers. <br />