Laserfiche WebLink
<br />ENGINEERING DEPARTMENT P. O. BOX 520, Pleasanton, CA 94566-0802 <br />Engineering Construction Services Landscape Architecture 200 Old Bernal Ave. 157 Main Street 200 Old Bernal Ave. <br />(925) 931-5650 (925) 931-5680 (925) 931-5650 Fax: 931-5479 Fax: 931-5484 Fax: 931-5479 <br /> <br /> <br /> <br /> <br /> COMMENT SUMMARY <br /> <br />Location: Lions Wayside Park <br />Date: June 22, 2022 <br />Project: Lions Wayside and Delucchi Parks Master Plan Update, CIP No. 06716 <br />Subject: Public Outreach Event <br />Attendees: City (Matt Gruber, Zack Reda) <br /> <br /> <br />Below is a summary of the comments received from residents and other meeting attendees for the <br />proposed Lions Wayside and Delucchi Parks Master Plan Update. <br /> <br />The public outreach took place from 6:00-7:30pm at Lions Wayside Park on Wednesday June 22, 2022. <br /> <br />Staff presented the conceptual design from the master plan adopted in 2014 along with the 2022 updated <br />plan. Additionally, staff advertised for the community survey and passed out flyers with a link to the <br />survey and an image of the updated conceptual plan. Staff spoke with approximately 30-40 people. <br /> <br />Below is a summary of comments regarding the project. <br /> <br />Design Comments <br />1. Remove the paths between the proposed bandstand and the Firehouse Arts Center so that it is <br />one large lawn/audience area. <br /> <br />2. The main audience area should not have paths, be playable, and inviting. <br />3. Do not reduce the grass area in Delucchi Park! <br />4. Install a bathroom in Lions Wayside Park. The bathroom in Delucchi Park is too far and has <br />insufficient capacity for events in the parks. <br /> <br />5. Relocate or remove the pathways in the large lawn/audience areas to create a contiguous grass <br />area. <br /> <br />6. Specify more permanent trash receptacles. <br />7. Don’t break up the grass area at Delucchi Park. <br />8. Add more picnic tables.