Laserfiche WebLink
ATTACHMENT 4 <br /> Bidder#1 Bidder#2 Bidder#3 Bidder#4 <br /> Mitigation OC Jones Desilva Gates Ghilotti Construction Teichert <br /> 4D-1a $ 698,080.00 $ 482,286.00 $ 835,992.00 $ 879,193.00 <br /> 4D-1b $ 771,754.00 $ 638,132.00 $ 864,754.00 $ 1,010,204.00 <br /> 4D-1c $ 3,715,837.75 $ 3,850,868.00 $ 4,234,459.18 $ 4,215,090.00 <br /> 4-D-3 $ 5,410,174.20 $5,708,521.00 $ 5,553,650.85 $ 6,528,162.20 <br /> $ 10,595,845.95 $ 10,679,807.00 $ 11,488,856.03 $ 12,632,649.20 <br /> 4D-1d $ 9,117,823.75 $ 9,464,340.00 $ 9,218,681.39 $ 11,476,322.99 <br /> TOTAL $ 19,713,669.70 $ 20,144,147.00 $ 20,707,537.42 $ 24,108,972.19 <br /> Variance to lowest 0 2.18% 5.04% 22.30% <br /> $ 19,713,669.70 $ 20,175,052.00 $ 20,707,537.37 $ 24,108,972.19 <br /> $ - $ (30,905.00) $ 0.05 $ - <br />