Laserfiche WebLink
ATTACHMENT 2 <br /> JDEDZ Traffic Mitigation Improvements Final Cost Estimate <br /> based on Ghilotti Constructoin bid <br /> JDEDZ Street Improvements Proiect <br /> (Mitigation Measures 4.D-1 a, 4.D-1b, 4.D-3, and 4.D-1c) <br /> Design - Keir and Wright $ 1,215,000 <br /> Design — Mark Thomas $ 1,204,890 <br /> Right of Way $ 2,581,876 <br /> Low Bid Amount $ 11,488,856 <br /> Contingency 10% of Low Bid $ 1,148,886 <br /> Construction Support— Keir and Wright $ 70,000 <br /> Construction Support— Mark Thomas $ 55,084 <br /> Construction Management $ 1,689,812 <br /> Construction Staking $ 195,736 <br /> City Inspection / Plan Check $ 736,356 <br /> Cost Control - Cumming $ 48,434 <br /> Subtotal $ 20,434,929 <br /> Stoneridge Drive and 1-680 Project <br /> (Mitigation Measure 4.D-1d) <br /> Design — Mark Thomas $ 783,975 <br /> Right of Way $ 275,612 <br /> Low Bid Amount $ 9,218,681 <br /> Contingency 10% of Low Bid $ 921,868 <br /> Construction Support— Mark Thomas $ 35,841 <br /> Construction Management $ 1,099,496 <br /> Construction Staking $ 126,227 <br /> Special Inspection - Environmental Monitoring $ 174,000 <br /> City Inspection / Plan Check $ 479,118 <br /> Cost Control - Cumming $ 31,514 <br /> Subtotal $ 13,146,332 <br /> Grand Total $ 33,581,261 <br />