My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
071922
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2022 3:03:29 PM
Creation date
7/14/2022 2:27:16 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/19/2022
DESTRUCT DATE
15Y
Document Relationships
09 SUPPLEMENTAL
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\071922
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to have been received by City until City is able to confirm the amount of City's actual receipt <br /> thereof from the State Board of Equalization. <br /> (kk) "Stoneridge Drive and I-680 Project" is defined in Recital E. <br /> (11) "Stoneridge Drive and 1-680 Project Right of Way" mean the land or other <br /> interests needed to be acquired to allow for the construction of the right of way for the <br /> Stoneridge Drive and 1-680 Project Right of Way. <br /> (milt) "Term"is defined in Section 2.2. <br /> (nn) "Traffic Development Fee"means that fee imposed on new development <br /> pursuant to Chapter 3.26 of the Pleasanton Municipal Code. <br /> ARTICLE 2. <br /> EFFECTR7E DATE AND TERM <br /> Section 2.1 Effective Date. This Agreement shall take effect the later of. (a)the date <br /> this Agreement is signed by both Parties; (b)the date when all of the JDEDZ Approvals are <br /> effective and(c)the date of the enactment of JDEDZ Transportation Fee(the"Effective Date"). <br /> Section 2.2 Term. The term of this Agreement begins on the Effective Date and ends <br /> the soonest of: (a)the date that lite City reimburses Costco the Costco Reimbursement Amount; <br /> (b)the first November 1st, following the end of the twenty-fifth (25th) Fiscal Year following the <br /> Opening of the Costco Store, subject to a year-for-year tolling in the event of a Force Majeurc <br /> Event;and(c)termination pursuant to the provisions of this Agreement(tile"Term"). <br /> ARTICLE 3. <br /> DESIGN AND CONSTRUCTION OF THE PROJECT IMPROVEMENTS <br /> Section 3.1 Design of Proieet Improvements. Costco shall be responsible for the final <br /> design of the Project Improvements. Costco shall retain a licensed,qualified engineering Grin or <br /> other qualified professional fine specializing in the relevant field to complete improvement plans <br /> and specifications for the Project Improvements. Such improvement plans and specifications <br /> shall be periodically submitted to the City Engineer for review and approval and must meet the <br /> City standards for the design and specifications of street improvements within the City of <br /> Pleasanton. Each of Costco's contracts for the design of the Project Improvements shall contain <br /> a provision allowing Costco to assign the contract and work product to the City. If Costco <br /> proposes to make any material design changes to the approved improvement plans and <br /> specifications following commencement of construction on the Project Improvements,Costco <br /> shall obtain the City Engineer's prior written approval prior to implementing the proposed design <br /> changes. <br /> Section 3.2 Final Cost Estimate. Upon the approval of the improvement plans and <br /> specifications for the Project Improvements by the City Engineer,Costco shall submit to the City <br /> Engineer for the City Engineer's review and approval a Final Cost Estimate for each of the <br /> JDEDZ Street Improvements and Stoneridge Drive and 1-680 Project("Final Cost Estimate"). <br /> The Final Cost Estimate shall be in sufficient detail to enable the City Engineer to analyze the <br /> 6 <br /> 1310 01\2218870.8 <br /> V712018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.